SAP ABAP Data Element /MRSS/T_DEM_RESTRICT_END (Demand End Restriction)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGD (Package) Planning Board Demand
Basic Data
Data Element /MRSS/T_DEM_RESTRICT_END
Short Description Demand End Restriction  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_DEM_RESTRICT_END    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 End 
Medium 15 End 
Long 20 End 
Heading End 
Documentation

Definition

Use

In the Demand Details:

If you select one of the restrictions for the end date, it applies to the current demand. The system then recalculates the date and the duration of the demand in accordance with the new restriction. At present, only the Must Finish On setting is relevant for MRS.

If you change the end date directly in the bar chart of the planning board, the system automatically sets the Must Finish On restriction in the demand details and calculates the start date if there are no other restrictions for the demand.

In the User Settings for the Planning Board:

If you select one of the restrictions for the end date, it applies to all demands whose dates are changed using the demand details or in the bar chart. You can change the default setting for individual demands in the demand details.

Dependencies

Example

If you have selected the Must Finish On option, the following applies:

  • If you change the end date of the demand, this is equivalent to moving the entire bar chart. The system calculates the start date based on the new end time and existing duration.
  • If you change the start date of the demand, the system does not change the end date but recalculates the duration of the demand.

Note: You must have selected the No Restrictions option for the start date.

History
Last changed by/on SAP  20141109 
SAP Release Created in 610