SAP ABAP Data Element /MRSS/T_DEM_NOT_DELIVER_GRACE (Permitted Extension for Demand Planning of Optimizer)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/OPT (Package) Multi Resource Scheduling: Optimizer

⤷

⤷

Basic Data
Data Element | /MRSS/T_DEM_NOT_DELIVER_GRACE |
Short Description | Permitted Extension for Demand Planning of Optimizer |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT1 | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Period |
Medium | 15 | Grace Prd (Dys) |
Long | 20 | Grace Period (Days) |
Heading | 18 | Grace Prd (Days) |
Documentation
Definition
Number of days for which a demand that could not previously be planned by the optimizer is to remain in the worklist for planning
Use
For example, if a demand is to be fulfilled by the 10th of the month (must end on) but it has not previously been possible to plan it, the optimizer attempts to plan the demand for a further X days.
However, higher non-fulfillment costs are incurred in this period to further increase the planning probability.
At the same time, the planner sees an alert in the planning board (provided these have not been deactivated) indicating that the end date of the demand has been exceeded and that it has not yet been planned.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |