SAP ABAP Data Element /MRSS/T_DEM_DAT (Move Assignment to Demand Date)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board

⤷

⤷

Basic Data
Data Element | /MRSS/T_DEM_DAT |
Short Description | Move Assignment to Demand Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | To DemDate |
Medium | 15 | To DemDate |
Long | 25 | Move to Demand Date |
Heading | 25 | Move to Demand Date |
Documentation
Definition
Use
If you select this option, the assignment dates are aligned to the dates of the selected demand (date and time) irrespective of the planning-board scaling (day or week view).
For concrete assignments, this may mean that the assignment is created in the non-availability period. For stretched assignments, the assignment is moved to the next availability period or (depending on your concretization setting) concretized in part.
System behavior for creating capacitive assignments is not affected by this option. The system always calculates the assignment dates using the start and end of the demand.
If you use this option, you can select only one demand and move it to the resource using drag & drop.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 607 |