SAP ABAP Data Element /MRSS/T_DELAY_ASSGN (Delay in Assignment Creation)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_DELAY_ASSGN |
| Short Description | Delay in Assignment Creation |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_DELAY_ASSGN | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Delay Assg |
| Medium | 15 | Delay Assgn. |
| Long | 20 | Delay Assignment |
| Heading | 19 | Delay in Assignment |
Documentation
Definition
Controls whether the system can shift new assignments that are to be created based on resource availability.
Use
If you set this indicator and attempt to create a demand in the planning board for a particular time using drag & drop, but the resource is not available at this time, the system creates the assignment in the time when the resource is next available.
Dependencies
Example
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 610 |