SAP ABAP Data Element /MRSS/T_DAG_PERIOD_OPTION (Demand Period for Total Demand)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/CAG (Package) Capacity Graphs
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/CAG (Package) Capacity Graphs
Basic Data
Data Element | /MRSS/T_DAG_PERIOD_OPTION |
Short Description | Demand Period for Total Demand |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_DAG_PERIOD_OPTION | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Dem.Period |
Medium | 18 | Demand Period |
Long | 31 | Demand Period for Total Demand |
Heading | 31 | Demand Period for Total Demand |
Documentation
Definition
Use
You use this field to specify the following:
- Whether the system takes into account the demand during the entire demand duration when calculating the total demand
- Whether the system takes into account only the period between the current date and the end date of the demand when calculating the total demand
Note that if you choose this option, the demand is not considered in the total demand calculation if the current date has exceeded the end date of the demand.
Dependencies
Example
The demand period started last week and ends next week. The total demand work amounts to 10 h and has not yet been scheduled.
If you choose the second option Demand Period Restricted by Current Date, the system distributes the 10 h of demand work starting with the current date to the end of next week.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |