SAP ABAP Data Element /MRSS/T_DAG_CONTRIBUTE_OPTION (Calculation Base for Total Demand)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/CAG (Package) Capacity Graphs
Basic Data
Data Element /MRSS/T_DAG_CONTRIBUTE_OPTION
Short Description Calculation Base for Total Demand  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_DAG_CONTRIBUTE_OPTION    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Calc. Base 
Medium 18 Calculation Base 
Long 37 Calculation Base for Total Demand 
Heading 37 Calculation Base for Total Demand 
Documentation

Definition

Controls how the total demand is calculated.

Use

You have the following options:

  • Calculate the total demand based on the demand work and period only

    If you choose this option, the system does not consider whether or not the demand has already been planned when calculating the total demand.

  • Calculate the total demand based on the assignment work and period

    If you choose this option, the total demand is calculated based on assignments instead of demands, provided the demands have already been planned by assigning individual human resources or team resources.

    For demands that have not yet been planned, the total demand is calculated based on the demand work and period.

Dependencies

Note that the setting you make here affects the free capacity. The capacity equals the total capacity minus the total demand.

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800