SAP ABAP Data Element /MRSS/T_COL_SPAN_COL_TIME (Maximum Duration of Non-Availability Periods (in min))
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_COL_SPAN_COL_TIME |
Short Description | Maximum Duration of Non-Availability Periods (in min) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_COL_SPAN_COL_TIME | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 11 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max. Dur. |
Medium | 20 | Non-Availblty (min) |
Long | 35 | Max. Duration of Non-Availability |
Heading | 42 | Max. Duration of Non-Availability |
Documentation
Definition
Indicates the maximum duration (in minutes) a non-availability can have in order to display a collision as a single unit in the planning board.
Note:
This field is only relevant for collisions between capacitive assigments.
Use
You use this field to specify how long a period of non-availability can be without interrupting a collision in the planning board.
If you do not enter a duration (min) here, a collision that is caused by the same collision object and extends across multiple periods of non-availability is displayed as multiple objects.
Dependencies
This field is only relevant if the following applies:
- Collisions between capacitive assignments have been configured in Customizing under Collision Settings --> Define Collisions.
- The availability-based utilization calculation has been activated in Customizing under Basic Settings --> Configure Basic Settings .
- The use of utilization-based collisions has been activated in Customizing under Set Up Scheduler Workplace --> Collision Settings --> Configure Settings for Collisions.
Example
Resource A has 2 capacitive assignments of 2-week duration each. The resource's working time is Monday to Friday from 9:00 to 17:00.
The following applies:
- If you do not enter a duration in this field, 10 single collisions (one per day) are displayed in the planning board between 9:00 and 17:00.
- If you enter a duration of, for example, 1000 min, the collision extends across periods of non-availability of up to 1000 min, for example, through the night. In that case, only two collisions are displayed - one for each week starting on Monday and ending on Friday.
- If you enter a duration of, for example, 4000 min, the collision can also extend across the weekend, resulting in only one collision being displayed.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |