SAP ABAP Data Element /MRSS/T_COL_SPAN_COL_TIME (Maximum Duration of Non-Availability Periods (in min))
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_COL_SPAN_COL_TIME
Short Description Maximum Duration of Non-Availability Periods (in min)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_COL_SPAN_COL_TIME    
Data Type INT4   4-byte integer, integer number with sign 
Length 10    
Decimal Places 0    
Output Length 11    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max. Dur. 
Medium 20 Non-Availblty (min) 
Long 35 Max. Duration of Non-Availability 
Heading 42 Max. Duration of Non-Availability 
Documentation

Definition

Indicates the maximum duration (in minutes) a non-availability can have in order to display a collision as a single unit in the planning board.

Note:
This field is only relevant for collisions between capacitive assigments.

Use

You use this field to specify how long a period of non-availability can be without interrupting a collision in the planning board.

If you do not enter a duration (min) here, a collision that is caused by the same collision object and extends across multiple periods of non-availability is displayed as multiple objects.

Dependencies

This field is only relevant if the following applies:

  • Collisions between capacitive assignments have been configured in Customizing under Collision Settings --> Define Collisions.
  • The availability-based utilization calculation has been activated in Customizing under Basic Settings --> Configure Basic Settings .
  • The use of utilization-based collisions has been activated in Customizing under Set Up Scheduler Workplace --> Collision Settings --> Configure Settings for Collisions.

Example

Resource A has 2 capacitive assignments of 2-week duration each. The resource's working time is Monday to Friday from 9:00 to 17:00.

The following applies:

  • If you do not enter a duration in this field, 10 single collisions (one per day) are displayed in the planning board between 9:00 and 17:00.
  • If you enter a duration of, for example, 1000 min, the collision extends across periods of non-availability of up to 1000 min, for example, through the night. In that case, only two collisions are displayed - one for each week starting on Monday and ending on Friday.
  • If you enter a duration of, for example, 4000 min, the collision can also extend across the weekend, resulting in only one collision being displayed.