SAP ABAP Data Element /MRSS/T_COL_OVERUTIL (Overutilization Causes Collision)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_COL_OVERUTIL
Short Description Overutilization Causes Collision  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Overutil. 
Medium 20 Overutilization Col. 
Long 32 Overutilization Causes Collision 
Heading 32 Overutilization Causes Collision 
Documentation

Definition

Controls whether or not the system displays a collision whenever the resource utilization exceeds 100%.

Use

Select this checkbox if you want to display a collision whenever a resource is overutilized, even if no parallel assignments or time allocations exist.

This is also applies to collisions on team level.

Dependencies

This checkbox is only relevant if the following applies:

  • A collision with key OVER has been configured in Customizing under Collision Settings --> Define Collisions and a graphical element has been assigned to it.
  • The use of negative capacity has been activated in Customizing under Basic Settings --> Configure Basic Settings.

Note that if you select this checkbox and the availability-based utilization is inactive, the system displays a collision in periods of non-availability if parallel assignments or time allocations exist.

Example

Example 1:

Resource A works 8 hours per day. A capacitive assignment with 10-hour duration is created for Monday. If you select this checkbox, a collision is displayed in the planning board for this day even though no parallel assignment exists.

Example 2:

A demand requires the assignment of 3 resources. Your team consists of 2 resources. If you select this checkbox, a collision is displayed.

History
Last changed by/on SAP  20141109 
SAP Release Created in 800