SAP ABAP Data Element /MRSS/T_CAP_PLAN (Capacity Planning)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_CAP_PLAN |
| Short Description | Capacity Planning |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Capacity |
| Medium | 15 | Capacity Plng |
| Long | 20 | Capacity Planning |
| Heading | 20 | Capacity Planning |
Documentation
Definition
Controls whether the team is to be planned in capacity planning only. You use capacity planning when you do not want to plan the team's assignments in detail.
Use
For teams within capacity planning, the assignments are always created from the validity start date to the validity end date of the team. Once you have created the team, you cannot change the indicator setting.
Dependencies
Example
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 401 |