SAP ABAP Data Element /MRSS/T_CAG_PN_CAPACITY_SCEN (Capacity Scenario for Capacity Planning Node)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/CAG (Package) Capacity Graphs
Basic Data
Data Element /MRSS/T_CAG_PN_CAPACITY_SCEN
Short Description Capacity Scenario for Capacity Planning Node  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_CAG_PN_CAPACITY_SCEN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PN CapScen 
Medium 20 PN Capacity Scenario 
Long 31 Planning Node Capacity Scenario 
Heading 31 Planning Node Capacity Scenario 
Documentation

Definition

Use

You use this field to specify the following:

  • Whether you want to use the capacity of human resources for the capacity calculation

    If you choose this option, the system takes into account the availability of individual human resources when calculating the total capacity. When calculating the free capacity, the system takes into account demands and assignments.

    If you choose this option, the system calculates the total demand separately. It also calculates further details related to the total demand (for example, unassigned demands and assigned demands). In Customizing activity Control Options for Total Demand Calculation you can specify which details are calculated.

  • Whether you want to use the work center capacity for the capacity calculation

    If you choose this option, the system takes into account the work center capacity or individual shifts of a work center when calculating the total capacity. When calculating the free capacity, the system takes into account demands only.

    If you choose this option, the system does not display any details for the total demand in the Capacity and Demand Overview report. It neither calculates the total demand separately nor any details that are related to assignments.

In addition, you specify the following:

  • Whether you want the system to re-calculate the capacity immediately on saving the planning board

    The re-calculated capacity is displayed in the Capacity and Demand Overview report after you have saved the planning board.

  • Whether you want the system to re-calculate the capacity in batch mode, that is, at regular intervals

    The re-calculated capacity is only displayed in the Capacity and Demand Overview report after the batch job has been run.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800