SAP ABAP Data Element /MRSS/T_CAG_PN_CAPACITY_BASE (Calculation Base for Total Capacity)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/CAG (Package) Capacity Graphs
Basic Data
Data Element /MRSS/T_CAG_PN_CAPACITY_BASE
Short Description Calculation Base for Total Capacity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_CAG_PN_CAPACITY_BASE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Total Cap. 
Medium 20 Total Capacity 
Long 40 Calculation Base for Total Capacity 
Heading 55 Calculation Base for Total Capacity 
Documentation

Definition

Controls how the availability of individual resources contributes to the total capacity.

Use

The total capacity is based on the individual availability of the resources that are assigned to a given planning node.

You have the following options to specify the calculation base for the total capacity:

  • Basic availability of the resource without on-call time allocations

    The basic resource availability is calculated based on time allocations. If you choose this option, the system considers all time allocations except for on-calls.

  • Basic availability of the resource including on-call time allocations

    If you choose this option, the system considers all time allocations including on-calls.

  • Gross availability of the resource without time allocations

    If you choose this option, the availability is calculated based on the planned working time of the resource. It does not include any time allocations.

Dependencies

This setting is only relevant if you have chosen Single Resource Planning as the planning node capacity scenario.

Example