SAP ABAP Data Element /MRSS/T_CAG_ACTIV_TYPE (Process Variant)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/CAG (Package) Capacity Graphs
⤷
⤷
Basic Data
| Data Element | /MRSS/T_CAG_ACTIV_TYPE |
| Short Description | Process Variant |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_CAG_ACTIV_TYPE | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Proc. Var. |
| Medium | 15 | Process Variant |
| Long | 20 | Process Variant |
| Heading | 11 | Process Var |
Documentation
Definition
Use
If you want to use SAP Multiresource Scheduling, you have to specify a process variant here. You can choose between the following variants of the resource planning process at the participant level in C projects order.
Contact person process:
With the contact person process, the requester first assigns his or her operations to a contact person, who then creates offer demands for one or more resource planners.
Resource planner process:
With the resource planner process, the requester assigns his or her operations to a resource planner directly.
If the requester assigns the operations to a resource planner straight away, the system creates demands that are then planned by the resource planner.
Dependencies
Example
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 700 |