SAP ABAP Data Element /MRSS/T_ASGN_CHNG_ALLOW (Allow Resource Planning Outside Resource Validity Period)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_ASGN_CHNG_ALLOW
Short Description Allow Resource Planning Outside Resource Validity Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Res. Plng 
Medium 17 Res. Planning 
Long 38 Planning Outside Validity 
Heading 51 Resource Planning Outside Validity 
Documentation

Definition

Use

If you select this checkbox, users are allowed to do resource planning outside the resource validity period. For example, users can create or delete assignments, time allocations, or alternative working times for resources that are no longer available.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in