SAP ABAP Data Element /MRSS/T_ACT_MID_POINT_RES_INIT (Include Resource Location Until First Assignment is Created)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_ACT_MID_POINT_RES_INIT |
Short Description | Include Resource Location Until First Assignment is Created |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Initially |
Medium | 20 | Include Initially |
Long | 30 | Include If No Assignments |
Heading | 40 | Include If No Assignments Exist |
Documentation
Definition
Indicates that the resource location is included in the midpoint calculation until an assignment is created for the resource.
Use
Select this checkbox if you want the system to take the resource location (resource address) into account as long as no planned demands (= assignments) exist for the resource. Once an assignment is created for the resource, the system no longer includes the resource location when calculating the route midpoint.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |