SAP ABAP Data Element /MRSS/T_ACT_MID_POINT_ASG_ORD (Include All Demand Locations in Midpoint Calculation)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_ACT_MID_POINT_ASG_ORD |
Short Description | Include All Demand Locations in Midpoint Calculation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | All Dem. |
Medium | 17 | All Demands |
Long | 20 | All Demand Locations |
Heading | 40 | Include All Demand Locations |
Documentation
Definition
Controls whether or not the system includes the location of all demands (planned demands and unplanned demands) when calculating the route midpoint.
A planned demand is a demand that has already been assigned to a resource. That is, an assignment has already been created for the demand. In contrast, unplanned demands have been linked to the resource in the appointment booking process, but do not yet have an assignment.
Use
Select this checkbox if you want the system to calculate the tour midpoint based on all demand locations.
Dependencies
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |