SAP ABAP Data Element /IBS/E_RUPZERO (RBD: No Planned Record With Zero Amount)
Hierarchy
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
   FS-RBD (Application Component) Value Adjustment
     /IBS/RB (Package) iBS: Reserve for Bad Debt
Basic Data
Data Element /IBS/E_RUPZERO
Short Description RBD: No Planned Record With Zero Amount  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 NoPRecZero 
Medium 16 NoPl.Rec.ZeroAmt 
Long 30 No Plan. Record With Zero Amt 
Heading 30 No Plan. Record With Zero Amt 
Documentation

Definition

During risk provision update, this indicator controls whether the system creates planned records for which the amount is zero for any source system contracts for which the system determined no change to the risk provision balance.

Use

Characteristic Value     Description

X    The system does not create planned records with a zero amount.

<blank>     If the result of the risk provision update for a source system contract is that no balance change is necessary, then the system creates a "zero amount" planned record and an evaluation sheet for the corresponding source system contract.

Dependencies

If you use the valuation method with the 'fair value' analysis horizon, then you use an evaluation sheet to calculate the risk provision requirement for valuations. If you want to process a relevant evaluation sheet in the RBD account dialog, you must assign at least one planned record to the evaluation sheet. If the result of an evaluation update for a source system contract is that it is not necessary to post a balance change (unwinding, appropriation, write-off, and so on), then it is only possible to change the evaluation sheet manually if the system created a "zero amount" planned record for the corresponding source system contract.

For this reason, you can use the No Planned Record With Zero Amount indicator to control whether the system is to create planned records with zero amounts during an update run.

Example

History
Last changed by/on SAP  20130529 
SAP Release Created in