SAP ABAP Data Element /IBS/E_RS_CLEAR (RBD: Provision Requirement Write-Off)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
FS-RBD (Application Component) Value Adjustment
⤷
/IBS/RB (Package) iBS: Reserve for Bad Debt

⤷

⤷

Basic Data
Data Element | /IBS/E_RS_CLEAR |
Short Description | RBD: Provision Requirement Write-Off |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /IBS/O_RBTRGV | |
Data Type | CURR | Currency field, stored as DEC |
Length | 23 | |
Decimal Places | 2 | |
Output Length | 31 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ProvRqWOff |
Medium | 15 | ProvReq.Wr.-Off |
Long | 29 | Provision Req. Write-Off |
Heading | 31 | Provision Requirement Write-Off |
Documentation
Definition
This field displays the amount that was/is posted as a write-off to the #Provision# balance.
Use
A write-off is a reduction to the corresponding risk provision balance (reserve).
If the provision requirement calculated for the specified key date for the source system contract is less than the provision balance that has already been posted, the provision balance must be reduced. If the provision balance to be reduced was calculated prior to the current fiscal year, the position is reduced by means of clearing.
Dependencies
On the #Turnover Processing# tab page of the RBD account, the system displays the corresponding planned record or actual record - dependent on whether or not the result of the key date evaluation has been posted already - for this amount .
Example
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |