Hierarchy

⤷

⤷

Basic Data
Data Element | /IBS/E_RPCABS |
Short Description | RBD: Total Planned Change (Absolute) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /IBS/O_RBTRGV | |
Data Type | CURR | Currency field, stored as DEC |
Length | 23 | |
Decimal Places | 2 | |
Output Length | 31 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PC (Abs) |
Medium | 15 | Tot. PC (Abs) |
Long | 35 | Total Planned Change (Absolute) |
Heading | 35 | Total Planned Change (Absolute) |
Documentation
Definition
Sum of the absolute planned change of the risk provision position in the currency specified.
Use
The sum of all planned records with Appropriation, Reset, Write-Off, Usage, Reclassification, and Unwinding flow category that exist for the RBD account and risk provision position are output within this field.
The amounts are totaled as absolute values, that is, without taking into account a plus/minus sign. (An absolute amount or absolute value is always a non-negative, real number.) In this way, the RBD accounts/risk provision positions can be sorted by absolute amounts, for example, the planned change (irrespective of whether increasing or reducing) in descending order from top to bottom.
Note: Planned records of the "Direct Write-Off" flow category are not taken into account in the Total Planned Change (Absolute) field.
Dependencies
Example
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in |