SAP ABAP Data Element /IBS/E_RKZCFR (RBD: Control CF Position Remaining Capital)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ FS-RBD (Application Component) Value Adjustment
⤷ /IBS/RB_BA (Package) iBS: RBD General Basis Objects
⤷ FS-RBD (Application Component) Value Adjustment
⤷ /IBS/RB_BA (Package) iBS: RBD General Basis Objects
Basic Data
Data Element | /IBS/E_RKZCFR |
Short Description | RBD: Control CF Position Remaining Capital |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /IBS/O_RYESNO | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CFP BENDV |
Medium | 15 | CF Pos. BENDV |
Long | 30 | Control CF Pos. Rem. Capital |
Heading | 35 | Control CF Position Rem. Capital |
Documentation
Definition
You use this parameter to control whether the due date of the cash flow position created by the system for the amount in the Remaining Capital in Contract Currency field is the same as the valuation key date, or the end date of the fixed interest period or the end of term date.
The checkbox can have the following values:
Characteristic Value Description
X The system creates a cash flow position for the remaining capital with the same due date as the evaluation key date.
<blank> The system creates a cash flow position for the remaining capital with the same due date as the end date of the fixed interest period or the end date of the term.
Use
Dependencies
- If you want to create a cash flow position for the remaining capital for which the due date is the same as the interest fixing period or end of term, then RBD update processing is always dependent on the chosen valuation key date. Note the following:
- If the end of the interest fixing period is on or after the velaution key date, the system creates the cash flow position for the remaining capital with a due date that is the same as the end of the interest fixing period.
- If the end of the interest fixing period is not supplied or is after the valuation key date, the system checks whether the end of term is on or after the valuation key date. In this case, the system creates a cash flow position for the remaining capital with a due date that is the same as the end of term.
- If both the end of the interest fixing period and the end of term are after the valuation key date, or neither date is supplied, the system creates the cash flow position for the remaining capital with a due date that is the same as the valuation key date.
- The system creates a corresponding cash flow position for those source system contract categorizations for which it is defined in the Customizing activity Contract Valuation (IAS) that the system is to create a cash flow position for the remaining capital.
Example
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |