Hierarchy
⤷ FS-RBD (Application Component) Value Adjustment
⤷ /IBS/RB (Package) iBS: Reserve for Bad Debt
Basic Data
Data Element | /IBS/E_REQ_US |
Short Description | RBD: Change Requirement Usage |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /IBS/O_RBTRGV | |
Data Type | CURR | Currency field, stored as DEC |
Length | 23 | |
Decimal Places | 2 | |
Output Length | 31 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Usage |
Medium | 15 | Usage Reqmts |
Long | 30 | Change Requirement Usage |
Heading | 50 | Change Requirement Usage |
Documentation
Definition
Amount that reflects the change requirements for the value adjustment position accumulated for the previous billing periods in response to a usage.
Use
A usage is generated whenever a loss posted for the relevant source system contract can lead to utilization (usage) of value adjustment positions accumulated in previous periods.
The change requirement for usage can be:
- Usage (negative amount, shown with '-' sign)
Which means a reduction of the 'value adjustment' risk provision position built up in previous billing periods.
- Reset usage (positive amount, shown without +/- sign)
Which means an increase of the 'value adjustment' risk provision position by partial or complete reversal of the usages built up by previous evaluations.
In the Customizing activity Define Settlement Period Changes, you can define billing periods that vary from the calendar year.
Dependencies
A usage posting always reduces the value adjustment position built up in previous billing periods.
Example
- In a previous billing period, a value adjustment position of EUR 1,000.00 was accumulated for source system contract A.
- In the current billing period, the source system contract is written off totally; the loss posted in the source system is EUR 1,200.00.
RBD generates the following postings:
- Usage of EUR 1,000.00
- Direct write-off of EUR 200.00.
The value adjustment position accumulated in previous periods for source system A is reduced at most by the amount of the loss. To prevent a negative value adjustment position from arising, the usage cannot be greater than the value adjustment position. The remaining amount of EUR 200.00 is posted as a direct write-off. Direct write-offs do not affect the value adjustment position.
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in |