SAP ABAP Data Element /IBS/E_RCOLUP2 (RBd Indicator: Collateral Update)
Hierarchy
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
   FS-RBD (Application Component) Value Adjustment
     /IBS/RB (Package) iBS: Reserve for Bad Debt
Basic Data
Data Element /IBS/E_RCOLUP2
Short Description RBd Indicator: Collateral Update  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /IBS/O_RYESNO    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CollUpdate 
Medium 18 Coll. Update 
Long 38 Indicator: Collateral Update 
Heading 35 Indicator: Collateral Update 
Documentation

Definition

You use the #Indicator: Collateral Update' for evaluations using the evaluation method with the 'Fair Value' analysis horizon to control whether collateral liquidation data is to be updated during a new evaluation in the future.

Use

Characteristic Value    Meaning

X    During a new evaluation in the future, the system updates the liquidation data of the collaterals.

<blank>    During a new evaluation in the future, the system does not update the liquidation data of the collaterals.

Dependencies

The system can only execute a collateral update if, in the Customizing activity Collateral Valuation per IAS, you defined that old expectation values are to be copied for the combination of Credit Rating Collateral Giver and Collateral Type. This is always the case if you set the Indicator: Copy Old Expectation Values in this Customizing activity.

Example

During the last evaluation on 12/21/2009, the liquidation date of a collateral was set as 01/15/2011.

A subsequent evaluation is executed on 03/21/2010 and the Indicator: Collateral Update is set/activated in the RBD account.

Processing:

  • In the last evaluation, the liquidation date of the collateral was set as being 380 days later than the evaluation key date (evaluation key date was 12/31/2009, liquidation date was 01/15/2011, difference = 01/15/2011 minus 12/31/2009 = 380 days.
  • The subsequent evaluation is executed with the evaluation key date 03/31/2010. Because the #Indicator Collateral Update# is set, the system must update the liquidation date of the collateral in the future:
    • The evaluation key date of the subsequent evaluation is 03/31/2010.
    • Liquidation date of the collateral must be 380 days after the new evaluation key date, therefore
    • new liquidation date = new evaluation key date + 380 days
      new liquidation date = 03/31/2010 = 04/15/2011

History
Last changed by/on SAP  20110810 
SAP Release Created in