SAP ABAP Data Element /IBS/E_PERCCF (RBD: Percentage Expectation Used for Cash Flow)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
FS-RBD (Application Component) Value Adjustment
⤷
/IBS/RB_BA (Package) iBS: RBD General Basis Objects

⤷

⤷

Basic Data
Data Element | /IBS/E_PERCCF |
Short Description | RBD: Percentage Expectation Used for Cash Flow |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3_2 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 2 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Perc. Exp. |
Medium | 15 | Perc. Expect. |
Long | 21 | Perc. Expectation |
Heading | 40 | Percentage Expectation for Cash Flow |
Documentation
Definition
This field contains the used percentage expectation for the individual cash flow position.
Use
You use this amount to calculate the expectation value of a cash flow position.
Dependencies
Based on the Amount of Cash Flow Position (Installment), the system calculates the value of the Expected Amount of Cash Flow Position based on the factor of the Used Percentage Expectation of Cash Flow.
Example
The following data is entered in the RBD account dialog or supplied the interface:
Field Value
Amount of Cash Flow Position (Installment) EUR 1,000.00
Used Percentage Expectation of Cash Flow 75,00 %
Result: Expected amount of cash flow position EUR 750.00
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 500 |