SAP ABAP Domain OIUREP_MMS_REAS_CD (MMS Reason Codes)
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-PRA-REP-ROY (Application Component) Royalty Reporting
     OIU_REP (Package) Production, Tax & Royalty Reporting
Basic Data
Domain Name OIUREP_MMS_REAS_CD
Short Description MMS Reason Codes  
Definition
Data Type CHAR Character String
No. Characters  
Decimal Places    
Output Length  
Conversion Routine   
Sign  
Lower Case  
Value Range
# Lower Limit Upper Limit Short Description
1 30     Reservoir- Gas-Cap Completion
2 31     Reservoir- Depleted and/or Pending Conversion or Abandonment
3 32     Reservoir- High Gas/Oil Ratio
4 33     Reservoir- Watered Out
5 34     Reservoir- Reservoir or Well Study
6 35     Reservoir- Testing
7 36     Reservoir- Waiting on Reservoir Response
8 37     Reservoir- Low Reservoir Pressure
9 38     Reservoir- High Water/Oil Ratio or Hight Water/Gas Ratio
10 40     Downhole- Hole in Tubing or Casing
11 41     Downhole- Sanded Up
12 42     Downhole- Communication with Another Zone
13 43     Downhole- Loaded Up with Water
14 44     Downhole- Collapsed Casing, Tubing, or Liner
15 45     Downhole- Subsurface Safety Valve Problems
16 46     Downhole- Junked Equipment in Hole
17 47     Downhole- Paraffin/Corrosion/Scale Problems
18 48     Downhole- Tubing Hanger Leak
19 49     Downhole- Gas-Lift Equip Problems or Downhold Pump Failure
20 50     Downhole- Pumping Rods Parted
21 60     Surface- Compressor Problems
22 61     Surface- Productn Equip Probs(separator, heater treater,etc)
23 62     Surface- Electrical
24 63     Surface- Surface Safety Valve Problems
25 64     Surface- Safety Equipment Problems
26 65     Surface- Wellhead Problems
27 70     Pipelines,Flowlines,Hdrs- Leaks
28 71     Pipelines,Flowlines,Hdrs- Tie-Ins
29 72     Pipelines,Flowlines,Hdrs- No Pipeline-No Market
30 73     Pipelines,Flowlines,Hdrs- Maintenance
31 74     Pipelines,Flowlines,Hdrs- Pipeline Curtailment
32 75     Pipelines,Flowlines,Hdrs- Check Valve Problems
33 76     Pipelines,Flowlines,Hdrs- NotCapable of Prod against pressr
34 77     Pipelines,Flowlines,Hdrs- Helium & CO2 Wells-No Mkt Demand
35 80     Platform- Drilling, Major workover, or Wireline Operation on
36 81     Platform- Damage to Platform
37 82     Platform- Related Construction
38 83     Weather- Hurricane or Storm
39 84     Weather- Freezing Problems
40 90     Weather- Ice Advancement
41 85     Regulatory- Eliminate Flaring of Oil Well Gas and/or Waste
42 86     Regulatory- Inspection Enforcement Action
43 87     Regulatory- Balancing Maximum Efficient Rate(MER) Overprodtn
44 88     Regulatory- Awaiting Fed Energy Reg Commissn(FERC) Approvals
45 89     Regulatory- Awaiting BLM/MMS Approval
46    
       
History
Last changed by/on SAP  20050223 
SAP Release Created in 46C