SAP ABAP IMG Activity SIMG_SHIP_PLAN_0001 (Maintain Attributes for Transportation Planning Point)
Hierarchy
☛
IS-OIL (Software Component) IS-OIL
⤷ IS-OIL-DS-TPI (Application Component) Transportation Planning Interface
⤷ OIK_P (Package) TPI (Transportation Planning Interface)
⤷ IS-OIL-DS-TPI (Application Component) Transportation Planning Interface
⤷ OIK_P (Package) TPI (Transportation Planning Interface)
IMG Activity
ID | SIMG_SHIP_PLAN_0001 | Maintain Attributes for Transportation Planning Point |
Transaction Code | S_SO7_65001167 | (empty) |
Created on | 20020214 | |
Customizing Attributes | SIMG_SHIP_PLAN_0001 | Maintain Attributes for Transportation Planning Point |
Customizing Activity | SIMG_SHIP_PLAN_0001 | Deactivate Driver/Vehicle Assignment |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_SHIP_PLAN_0001 |
In this IMG activity, you can:
- Deactivate the indicator that requires you to make a driver-vehicle assignment before trip planning (transaction O4PP) can start. This Customizing option is at transportation planning point level.
When the driver-vehicle assignment is deactivated, the system displays a different selection screen for trip planning (transaction O4PP). On this screen, you can enter selection criteria as a range and independent of the driver-vehicle assignment.
- Set the indicator for the estimated time of arrival.
If the indicator for the estimated time or arrival is set:
- The system defaults the estimated time of arrival from table OIK37.
- You can enter the estimated time of arrival in the shipment planning workbench.
- Set the indicator for equal assignment.
When you create multiple shipments with identical vehicles, driver shifts, and trips, the system carries out one of the following checks:
- Whether the scheduling date is identical for all shipments. For the system to carry out this check, the Equal Assignment indicator must be set.
- Whether the loading date is identical for all shipments. For the system to carry out this check, the Equal Assignment Indicator must not be set.
- Set the indicator for not defaulting the trip sequence in the shipment planning workbench (transaction O4PP).
- Set the indicator for not defaulting the total quantity in the shipment planning workbench (transaction O4PP).
- Maintain the maximum value for the shipment status.
On the selection screen for trip planning (transaction O4PP), the system defaults the maximum value from Customizing.
Example
Requirements
Standard settings
Recommendation
Activities
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_SHIP_PLAN_0001 | 0 | I400022113 | Transportation Planning Interface |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TOIKTPP | V - View | SM30 |
History
Last changed by/on | SAP | 20020404 |
SAP Release Created in | 46C |