Hierarchy
⤷ IS-OIL-PRA (Application Component) Production and Revenue Accounting
⤷ OIU (Package) PRA Production and Revenue Accounting (Upstream Business)
IMG Activity
ID | SIMG_SB_OIU_IND_TER | Define Industry Term Values for Pricing |
Transaction Code | S_SO7_28000012 | (empty) |
Created on | 20030804 | |
Customizing Attributes | SIMG_SB_OIU_IND_TER | Industry Terminology to calculation rule mapping |
Customizing Activity | SIMG_SB_OIU_IND_TER | Industry Terminology to calculation rule mapping |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_PRA_OIU_IND_TER |
Use
In this IMG activity, you can define values for an industry term (such as EDQ or COPAS) that the system uses within a formula to calculate pricing.
Requirements
Standard settings
Activities
Example
Example of EDQ Pricing -- Entries for a Run Ticket Dated Jan 8, 2001
Reference date exit -- 201 (for run ticket date)
RDOff -- 3 (for 1st day of current month which equates to Jan 1, 2001)
Time unit of measure -- 3 for month
Period before -- <leave blank>
Period after -- 1 (equates to Jan 31, 2001, which is one month, or time unit, after Jan 1, 2001)
With these entries, the system assumes EDQ and bases pricing on those prices in effect from Jan 1, 2001 to Jan 31, 2001.
Example of COPAS Pricing -- Entries for a Run Ticket Dated Jan 8, 2001
Reference date exit -- 201 (for run ticket date)
RDOff -- 1 (for no offset)
Time unit of measure -- <leave blank>
Period before -- <leave blank>
Period after -- <leave blank>
With these entries, the system uses pricing in effect on Jan 8, 2001.
Example of Metered Sales Oil Pricing Entries for a Pipeline Metered Jan 1, 2001 to Jan 15, 2001
Reference date exit -- 200 (for sales date)
RDOff -- 1 (for no offset)
Time unit of measure -- 201 (for range)
Period before - <leave blank>
Period after - <leave blank>
With 201 (range) specified in the Time unit of measure field, the system uses both the sales from and sales to dates as the range for pricing.
Example of Natural Gas Pricing Entries
Reference date exit -- 200 (for sales date)
RDOff -- 201 (for 1st of month exact)
Time unit of measure - < leave blank>
Period before - <leave blank>
Period after - <leave blank>
With these entries, the system selects the price entered on the first day of the month. If no price exists on the first day of the month, an error occurs.
Business Attributes
ASAP Roadmap ID | 899 | not to be assigned |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
OIU_IND_TER_CALC | S - Table (with text table) | SM30 |
History
Last changed by/on | SAP | 20031002 |
SAP Release Created in | 472 |