SAP ABAP IMG Activity SIMG_OHT071 (Compensate Overtime Worked on a Public Holiday)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PT (Application Component) Personnel Time Management
     PTIC (Package) HR Time Data: Customizing
IMG Activity
ID SIMG_OHT071 Compensate Overtime Worked on a Public Holiday  
Transaction Code S_AHR_61010223   IMG Activity: SIMG_OHT071 
Created on 19981221    
Customizing Attributes SIMG_OHT071   Compensate overtime worked on a public holiday 
Customizing Activity SIMG_OHT071   Compensate Overtime Worked on a Public Holiday 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_OHT071    

This is a special function which you can use if the standard functions
do not suffice for your purposes.

You can determine how overtime worked on a public holiday should be
compensated in this step.

Example

An employee works for 9 hours on a public holiday. The employee's daily planned working time on a normal day would be 8 hours. You wish the employee to be paid as follows:

  • payment for lost time (here: 8 hours)
  • payment for work on public holiday (here: 9 hours)
  • overtime bonus for the time exceeding the theoretical planned working time (here: 1 hour)

Requirements

  • Overtime pairs have been generated from an attendance quota, i.e. function GOT TO20 must be active, for example.
    Determine overtime from attendance quotas contains further notes on this.
  • You have determined grouping parameters for wage type generation.
    Please refer to Set groupings for more information.

Standard settings

The system calls subschema TOH0. As a first step, the time pairs for overtime which overlap with the generated planned working time pairs are flagged with procesing type "X" in personnel calculation rule TO90. Wage type generation is then performed for all time pairs flagged with processing type "X". The function is deactivated.

Recommendation

Activities

  1. Decide whether you want to remunerate work on public holidays as suggested in the above example.
  2. If so, activate function COPY TOH0.

Further notes

  • If you do not activate the subschema, overtime is generated for all time worked on public holidays and remunerated with the appropriate bonuses.
    In the above example, the employee would receive a bonus for 9 hours of overtime.
  • Wage type generation takes place at at later stage for time pairs which are not flagged with "X", that is time pairs outside of the theoretical planned working time.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_OHT071 0 HLA0003735 Time Evaluation with Clock Times 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
PSCC L - Logical transport object PE00 TM00 47 Modify Schema: Function COPY TOH0 
History
Last changed by/on SAP  19981221 
SAP Release Created in