Hierarchy
⤷ PT (Application Component) Personnel Time Management
⤷ PTIC (Package) HR Time Data: Customizing
IMG Activity
ID | SIMG_OHT064 | Determine Overtime from General Overtime Approvals |
Transaction Code | S_AHR_61010183 | IMG Activity: SIMG_OHT064 |
Created on | 19981221 | |
Customizing Attributes | SIMG_OHT064 | Determine overtime from general overtime approvals |
Customizing Activity | SIMG_OHT064 | Determine Overtime from General Overtime Approvals |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_OHT064 |
Determine overtime from attendance quotas explained how working time outside of the specifications in the daily work schedule can be approved. The approval can vary from person to
person, and can also vary in length.
In the following step, you can assign general overtime approvals or no approvals at all. The procedure described for calculating
overtime is not active in the standard system.
Example
- You want to assign certain employees approval for overtime worked
outwith their planned working time. This approval should be valid over
a longer period. - You want to assign general overtime approval to all employees who
are allocated a particular daily work schedule. - It is not necessary to assign these employees overtime approval. All
hours worked outside of planned working time are recognized as overtime.
The following conditions always apply to overtime calculation, however:
- The employee has completed the planned hours in the daily work schedule.
- Overtime is credited only up to the maximum daily working time.
Requirements
Standard settings
The following options are provided in the standard system to cover the above requirements:
- Evaluation of the General overtime field in the Time
Recording Information infotype (0050). The field is evaluated
in personnel calculation rule TO10. - Evaluation of the Automatic overtime field in the daily work schedule. The field is evaluated in personnel calculation schema TO15.
- Personnel calculation schema TO16 calculates overtime without
validating it against an approval.
Recommendation
Activities
- Decide whether general overtime approvals are to be used in your enterprise. Activate or delete the relevant lines in the schema.
- The conditions for overtime (planned hours completed, maximum daily
working time observed) can be customized in personnel calculation
rule TO11 if necessary.
Further notes
If you want all time worked outside of planned working time to be acknowledged as overtime, with no conditions, you can use function TIMTP. You can enter processing type 'M' and time type 0040 for
time identifier 01 (unapproved overtime) in the time type determination table. Please see Compare daily
daily work schedule with actual times and Define time type determination.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_OHT064 | 0 | HLA0003735 | Time Evaluation with Clock Times |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
PSCC | L - Logical transport object | PE00 | TM00 18 | Modify Schema: Function DPTOL |
History
Last changed by/on | SAP | 19981221 |
SAP Release Created in |