SAP ABAP IMG Activity SIMG_OHT058 (Indicate Planned Working Time Pairs)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PT (Application Component) Personnel Time Management
     PTIC (Package) HR Time Data: Customizing
IMG Activity
ID SIMG_OHT058 Indicate Planned Working Time Pairs  
Transaction Code S_AHR_61009942   IMG Activity: SIMG_OHT058 
Created on 19981221    
Customizing Attributes SIMG_OHT058   Indicate planned working time pairs 
Customizing Activity SIMG_OHT058   Indicate Planned Working Time Pairs 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_OHT058    

This step explains how the system determines the planned working times from the available data. The system checks that only pairs within the maximum working time are flagged as planned time pairs. You can specify how the system should react if the maximum daily working time is exceeded. The maximum daily working time is either defined in the daily work schedule or taken from the constant table.

Example

You wish to assign the time identifier overtime (unapproved) to time pairs which exceed the maximum daily working time.

Requirements

  • Function TIMTP must be processed to determine time types.
  • Time type determination groups 02 and 03
    should not be used to determine time types using function TIMTP.

Standard settings

A new processing type "S" (planned working pair) is assigned to all time pairs within the maximum daily working time with processing type "A" (planned working pair: absence) or "P" (planned working pair: attendance). Time pairs which exceed the maximum daily working time retain their time identifier.

Recommendation

Activities

  1. Decide which time identifier you wish to assign to time pairs which exceed the maximum daily working time.
  2. In function DEFTP, enter the required time identifier as the second parameter.
  3. If you have not set a maximum daily working time in the daily work schedule, set the maximum daily working time as a constant for all daily work schedules.

Further notes

  • The function also fills two time types:
    • 0000 Interim planned working time
    • 0001 Interim attendance time during planned working time
      The time types are determined on the basis of the processing type assigned by function TIMTP.
    • The times of all pairs with processing type "A" or "P" which have become planned working time pairs are cumulated in time type 0000.
    • The times of all pairs with processing type "P" which have become planned working time pairs are cumulated in time type 0001.
      Both time types are used in determining overtime and shortening absences.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_OHT058 0 HLA0003735 Time Evaluation with Clock Times 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
PSCC L - Logical transport object PE00 TM00 17 Modify Schema: Function DETTP 
VV_511K_B_TGMAX_AL0 V - View SM30 Determine Maximum Daily Working Time 
History
Last changed by/on SAP  19981221 
SAP Release Created in