SAP ABAP IMG Activity SIMG_CFMENUOHP5OODU (Define Report Variant for Time Evaluation)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PT-SP (Application Component) Shift Planning
     PP8C (Package) Shift Planning - Customizing
IMG Activity
ID SIMG_CFMENUOHP5OODU Define Report Variant for Time Evaluation  
Transaction Code S_AHR_61004991   IMG Activity: SIMG_CFMENUOHP5OODU 
Created on 19981221    
Customizing Attributes SIMG_CFMENUOHP5OODU   Define Report Variant for Time Evaluation 
Customizing Activity SIMG_CFMENUOHP5OODU   Define Report Variant for Time Evaluation 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOHP5OODU    

In this step, you specify which time evaluation report variant should be used for Shift Planning.

Requirements

First define a report variant for time evaluation.

Standard settings

The standard SAP system does not contain a report variant for time evaluation.

Activities

In the Value abbr. field, enter the report variant that is to be used when time evaluation is called (that is, the report variant you defined in the Create Report Variant for Time Evaluation) step.

Notes

If no report variant is entered here, the time evaluation report that you defined in the Set Up Time Evaluation Access is run without a variant.

The variant selected here is controlled by the variant stored in user parameter PET.

Further notes

Entries for the amount of leave taken and the quota used, which are determined in time evaluation, only take any changes made in the current planning period into account after the entries have been saved.

This restriction is only valid if leave taken is calculated against the Leave Entitlement infotype (0005) and the quota used against the Absence Quotas infotype (2006) or Attendance Quotas infotype (2007).

Keep in mind that the data entered from RPTIME00 is evaluated as follows:

  • Before entries are saved, data is read, evaluated and checked according to the configured schema
  • When entries are saved, current quotas, as well as any collisions that may occur with other time data, are checked

Example

An employee can take 10 days of leave (vacation). Schedule 15 days of leave for this employee in the current planning period.

  • If you start time evaluation before saving the entries, a period of 15 days is evaluated as 0 productive hours and therefore the 15 days are considered leave days.
  • When you try to save the entries, the system issues a message that the quota is exceeded by a total of five days. Correct the leave request by subtracting 5 days. Now you can save the entries.

The collision check saves you from processing time-consuming corrections in the saved shift plans.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOHP5OODU 0 HLA0009713 A HLA0009704  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T77S0SC V - View OODU 0000000003 Working time/shift plan: report variant 
History
Last changed by/on SAP  19981221 
SAP Release Created in