SAP ABAP IMG Activity SIMG_CFMENUOHP1OORW (Maintain Rule Values)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-OS (Application Component) Organizational Structure
     PP0C (Package) Organization and Planning - Customizing
IMG Activity
ID SIMG_CFMENUOHP1OORW Maintain Rule Values  
Transaction Code S_AHR_61003190   IMG Activity: SIMG_CFMENUOHP1OORW 
Created on 19981221    
Customizing Attributes SIMG_CFMENUOHP1OORW   Maintain Rule Values 
Customizing Activity SIMG_CFMENUOHP1OORW   Maintain Rule Values 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOHP1OORW    

In this step, you define a rule value for the average working time that applies generally in your enterprise. Do this if you have not created infotype 1011 "Work schedule" for your organizational units, positions and work centers.

  • With the entry "WORKT DAILY", you define a rule value for daily working time (in hours).
  • With the entry "WORKT DAYMT", you define a rule value for monthly working time (in days).
  • With the entry "WORKT DAYWK", you define a rule value for weekly working time (in days).
  • With the entry "WORKT DAYYR", you define a rule value for annual working time (in days).
  • With the entry "WORKT PERCK", you determine which of these values is to be used as the the basis for the calculation of planned working times.

If you want to use these rule values as default values for the maintenance of infotype 1011, define which of the values you want to use.

  • With the entry "WORKT PERCK", you determine whether the daily, weekly, monthly or annual working time (see above) is to be used as the basis for the calculation of planned working times.

If you do not want to use a default value for the maintenance of infotype 1011, define which working time type is to be permitted and how large the number range is to be:

  • With the entry "WORKT PERCK", you determine whether the daily, weekly, monthly or annual working time is to be permitted as the basis for calculation of planned working times.
  • With the entries "WORKT MAXHR" and "WORKT MINHR", you specify the maximum and minimum values of daily working time to check plausability for the maintenance of infotype 1011, "Work schedule". If this value is exceeded or is not reached, a warning appears.

You can define evaluation paths, with which working times for objects for which infotype 1011 has not be maintained, can be found:

  • With the entries "WORKT PATHA", "WORKT PATHO" and "WORKT PATHS", you determine evaluation paths, which the system uses to read working times for work centers, positions or organizational units.

If infotype 1011 has not be maintained for a position, for example, you can use the entry "WORKT PATHS" to determine the working time by reading the working time of the organizational unit to which the position is assigned.
If infotype 1011 has not be maintained for this organizational unit, the system reads the working time of the next superior organizational unit ("WORKT PATHO").

The following evaluation paths must be entered in table T778A.

Standard settings

  • WORKT DAILY 800
  • WORKT DAYMT 2170
  • WORKT DAYWK 500
  • WORKT DAYYR 26000
  • WORKT MAXHR 2400
  • WORKT MINHR 100
  • WORKT PATHA WRKT_AO
  • WORKT PATHO WRKT_O
  • WORKT PATHS WRKT_SO
  • WORKT PERCK M

Recommendation

The working time values that are determined by an overall rule value in infotype 1011 for an organizational unit, are used as the basis for the a working time check. A working time check takes place, if you fill a position with a person. The working time for the position (from infotype 1011) is compared to the person's working time (from infotype 0007 of Personnel Administration). If these times differ, a warning appears.

  • The entry WORKT PERCK should always be the same as the corresponding entry in Personnel Administration.
  • If you do not want to maintain infotype 1011, you can change the entry WORKT PERCK at any time, as long as the entry in Personnel Administration is also changed.
  • If you want to maintain infotype 1011, decide this before begin the set up.

Otherwise you risk rounding errors and loss of data.

we generally recommend that you maintain infotype 1011 for the organizational objects in your enterprise (the root organizational unit at least), as this is the only way that a history will be kept of changes to working times.

Activities

  1. Enter valid average working times per day as well as per week, month and year.

These entries must be to two decimal places, for example, the value 2170 for entry "WORKT DAYMT" means 21.7 days per month or a value of 800 for entry "WORKT DAYLY" means 8,00 hours per day.

  1. Using one of the following values, determine which entry is to be used as the default value:

D = "WORKT DAILY"
W = "WORKT DAYWK"
M = "WORKT DAYMT"
Y = "WORKT DAYYR"

  1. Change the maximum or minimum values of working time per day.

This entries must also be to two decimal places, for example, a value of 1000 means 10,00 hours per day.

  1. If you have defined specific evaluation paths in the step Maintain evaluation paths, check the default values entered.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOHP1OORW 0 HLA0009701 O HLA0009715 O  
SIMG SIMG_CFMENUOHP1OORW 1 HLA0009702 O HLA0100342 O HLA0009709 O HLA0100341  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T77S0SC V - View OORW 28 View T77S0 
History
Last changed by/on SAP  19981221 
SAP Release Created in