SAP ABAP IMG Activity OHTX0147 (Define Working Weeks)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PT (Application Component) Personnel Time Management
     PTIC (Package) HR Time Data: Customizing
IMG Activity
ID OHTX0147 Define Working Weeks  
Transaction Code S_AHR_61010570   IMG Activity: OHTX0147 
Created on 19981221    
Customizing Attributes OHTX0147   Define working weeks 
Customizing Activity OHTX0147   Define Working Weeks 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name OHTX0147    

You define the working week in this step. It allows you to define individual working time periods that are not based on fixed durations.

The term "working week" is flexible and is characterized by the following attributes:

  • The working week can start at any time and on any weekday
  • The length of the working week is determined by specifying a number of days

You can determine the working week for individual employees in the Planned Working Time infotype (0007).

Example

You want to determine overtime on the basis of the working week.

You want to cumulate time balances over a working week and compare them to value limits.

Activities

  1. In the Define working weeks activity, specify the length of the working week
    1. Assign a two-character key to identify the working week
    2. Set the period to be determined in days
    3. Enter a starting date for the working week
    4. Enter a start time
  2. In the Activate working week entry field activity, activate the field for the Planned Working Time infotype (0007). The relevant field is not visible in the standard system, and must first be activated using infotype screen control. To do this, go into the detail screen and change the attribute of the P0007-WWEEK field to the standard setting.
  3. In the Set default values for working weeks activity, maintain feature WWEEK. You can use the feature to generate a default value for the working week automatically when you create a Planned Working Time infotype record. You can vary the value according to an employee's organizational assignment.

Further notes

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG OHTX0147 0 HLA0006758 Time Evaluation 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
T559A S - Table (with text table) SM30 Define Working Weeks 
T588M S - Table (with text table) SM30 06 Activate 'Working Week' Entry Field 
PMKC L - Logical transport object PE00 WWEEK 02 Set Default Values for Working Weeks 
History
Last changed by/on SAP  19990616 
SAP Release Created in