Hypertext: Object Class - Class to which a document belongs.
Document Name
OHTPT0012
In this IMG step, you configure a time management scheme so that overtime is taken into account when calculating the employee's vacation allowance.
The activities you must carry out and a short description of each of them are described below under Activities.
Recommendation
If you use positive time evaluation (with time clock), you must configure TM00
If you use negative time evaluation (without time clock), you must configure TM01.
Activities
For POSITIVE TIME EVALUATION
If you are using Time Management for the first time, copy TM00 scheme
To import Overtime (infotype 2005), remove the asterisc from line P2005
To assign processing type M to records imported from infotype 2005 remove asterisc from line PTIP TD40 GEN
To create wage types /65A and /65B, which are used in the report HR-PT: Overtime Communication, insert the line PTIP PCTP GEN in the time wage type generation block.
To use value 01 for "Day grouping for wage type generation", replace line DAYMO 01 02 02 02 by DAYMO 01 01 01
To have the time wage types configured according to the portuguese configuration of Overtime, replace line POVT TC40 GEN by POVT PC20 GEN
To copy the values of the time wage types to time types (APT1 through APT4), insert PZL PC25 M after calling the calculation rule PC20.
Save your entries.
For NEGATIVE TIME EVALUATION
If you are using Time Management for the first time, copy scheme TM01 (do not use TM00)
Perform the same activities described above for Positive Time Evaluation, starting from step d (skip steps a, b and c)
Save your entries.
Regardless of the type of time evaluation (positive or negative) you use,
Insert an asterisc in the line PCC1 in the scheme PT00