SAP ABAP IMG Activity OHAPT_TI321 (Read planned working time from work schedule)
Hierarchy
SAP_HRCPT (Software Component) Sub component SAP_HRCPT of SAP_HR
   PY-PT (Application Component) Portugal
     P19C (Package) HR customizing: Portugal
IMG Activity
ID OHAPT_TI321 Read planned working time from work schedule  
Transaction Code S_AHR_61004563   IMG activity: OHAPT_TI321 
Created on 19981221    
Customizing Attributes OHAPT_TI321   Read planned working time from work schedule 
Customizing Activity OHAPT_TI321   Read planned working time from work schedule 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name OHAPT_TI321    

In this step, you set up the function P2000 in the personnel calculation schema PC00. This function imports the day's planned working time data and generates atime pair based on the planned working time.

Example

The standard SAP system distinguishes four types of day:

  • blank = work / paid
  • 1 = off / paid
  • 2 = off / unpaid
  • 3 = off / special day

Time pairs should be formed according to planned working time for day type 1 (usually public holidays), and delimited with time data which have already been imported.

Standard settings

Planned working times are imported and time pairs formed accordingly. The system does not take into account the core times specified in the daily work schedule.

Activities

  1. For the system to create a planned time pair for each day irrespective of the day type, enter ALWAYS as the first parameter of the function P2000 in the personnel calculation schema PC00.
  2. Specify how the time pairs to be imported should be merged with the existing time pairs. To do this, set up the second parameter of function P2000, as follows:
    • blank: existing time pairs remain unchanged
    • xy: only the time pairs for which the pair type is recorded
      (in this case, x or y) are delimited by the pairs
      to be imported
    • *: Each existing time pair which collides with an imported
      time pair is delimited.
  3. Decide whether or not the core time in the daily work schedule is relevant for further processing. If not, enter N as the third parameter in function P2000.
  4. If you enter NOTP as the fourth parameter, time pairs are not derived from the daily work schedule. You can use this parameter if the actual work schedules are to be taken directly from the recorded attendances (infotype 2002).

Further notes

In time accounting, the pair type of the time pair indicates whether the employee is at work or absent. The pair types are as follows:

  • 1: attendance
  • 2: recorded absence
  • 3: off-site work

The time pairs imported by this function are assigned the pair type attendance pairs ("1") and the origin indicator BLANK on a workday.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency I   Valid for countries specified 
Customizing Attributes Country Key Country Name
OHAPT_TI321 PT Portugal
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG OHAPT_TI321 0 AHR0000494 Integration with Time Management 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T508A V - View SM30 Work schedule rule 
PSCC L - Logical transport object PE00 PC00 P2 Maintain schema PC00 
History
Last changed by/on SAP  19981221 
SAP Release Created in