Hierarchy

⤷

⤷

IMG Activity
ID | OHAHK_TI321 | Read Planned Working Time from Work Schedule |
Transaction Code | S_AHR_61008434 | IMG-Aktivität: OHAHK_TI321 |
Created on | 19981221 | |
Customizing Attributes | OHAHK_TI321 | Read planned working time from work schedule |
Customizing Activity | OHAHK_TI321 | Read planned working time from work schedule |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OHAHK_TI321 |
In this IMG activity you set up function P200 in personnel calculation schema TC00. This function imports the day's planned working time and generates a time pair based on the planned working time.
Example
The standard SAP system distinguishes four day types:
- blank = work / paid
- 1 = off / paid
- 2 = off / unpaid
- 3 = off / special day
You want time pairs to be formed according to planned working time for day type 1 (usually public holidays), and delimited with time data which has already been imported into table.
Standard settings
Import planned working times into table. You form time pairs according to the planned working times. Core times specified in the daily work schedule are not taken into account.
Activities
- If you want the system to create a planned pair each day irrespective of the day type, enter EVER as the first parameter of function P2000 in personnel calculation schema TC00.
- Specify how the time pairs to be imported should be merged with the existing time pairs. To do this, set the second parameter of function P2000 as follows:
- blank: existing time pairs remain unchanged
- xy: only time pairs for which the pair type is listed
(in this case, x or y) are delimited by the pairs
to be imported - *: Each existing time pair which collides with an imported
time pair is delimited. This applies to all imported time
pairs. - Decide whether or not the core time in the daily work schedule is relevant for further processing. If not, enter N as the third parameter in the function P2000.
- If needed enter NOTP as the fourth parameter. The time pairs are not derived from the daily work schedule if this parameter is entered. You can use this parameter if the actual times are to be taken directly from the recorded attendances (infotype 2002).
Further notes
In time evaluation, the pair type of the time pair indicates whether the employee is at work or absent. The pair types are as follows:
- 1: attendance
- 2: recorded attendance
- 3: off-site work
The time pairs imported by this function are assigned the pair type attendance pairs ("1") and the origin indicator BLANK on a workday.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | I | Valid for countries specified |
Customizing Attributes | Country Key | Country Name |
---|---|---|
OHAHK_TI321 | HK | Hong Kong |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OHAHK_TI321 | 0 | AHR0000319 | Integration with Time Management |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
PSCC | L - Logical transport object | PE00 | TC00 H2 | Edit day processing of time data schema | ||
V_T508A | V - View | SM30 | Work schedule rule |
History
Last changed by/on | SAP | 20000127 |
SAP Release Created in |