SAP ABAP IMG Activity OHABR_AU015 (Maintain scheme to activate arrears control)
Hierarchy
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
   PY-BR (Application Component) Brazil
     P37C (Package) Customizing HR Brazil
IMG Activity
ID OHABR_AU015 Maintain scheme to activate arrears control  
Transaction Code S_AHR_61001025   IMG activity: OHABR_AU015 
Created on 19981221    
Customizing Attributes OHABR_AU015   Maintain scheme to activate arrears control 
Customizing Activity OHABR_AU015   Maintain scheme to activate arrears control 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name OHABR_AU015    

In this section of the implementation guide you insert, in time management main scheme, the rules used during arrears calculation.

Example

Requirements

Standard settings

Recommendation

Activities

  1. Copy standard scheme TM00 to a new one that corresponds to the name allowed for users, as for example ZTM0.
  2. Copy calculation rules BRT1 and BRT2 to individual rules with new names, as for example ZRT1 and ZRT2.
  3. Insert new copied rules in scheme ZTM0 as follows:
    1. Calculation rule ZRT1 : insert it in line prior to function call RTIP TR10, indicating function PTIP in suitable column (Finances) and ZRT1 in column corresponding to parameter 1 (Par1).
    2. Calculation rule ZRT2 : insert in line prior to function call CUMBT , indicating function ACTIO in suitable column (Finances) and ZRT2 in column corresponding to parameter 1 (Par1).
  4. Save and activate changes.

Further notes

  1. In case you have inserted sub-scheme BRT1 as described in the Implementation Guide: Maintain scheme to activate PWR/acquisition period control (in section Payroll run Brazil -> Absences -> Maintain scheme to activate PWR/acquisition period control), the insertion of calculation rule ZRT1 must be done in the line that shoulb be set betwee the sub-scheme call ZRT1 and function RTIP TR10 as follows:
    • Define function ACTIO in suitable column (Finances) and ZRT1 in column corresponding to parameter 1 (Par1).
  2. For further information on how to copy schemes and calculation rules, please see specific documentation for the transaction in menu option Help -> Application help.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency I   Valid for countries specified 
Customizing Attributes Country Key Country Name
OHABR_AU015 BR Brazil
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG OHABR_AU015 0 AHR0000056 Wage Type Valuation 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
PCYC L - Logical transport object PE00 BRT1 01 Rule for arrears calculation 
PCYC L - Logical transport object PE00 BRT2 01 Rule for arrears wage types creation 
PSCC L - Logical transport object PE00 TM00 BR2 Scheme for time evaluation 
History
Last changed by/on SAP  19981221 
SAP Release Created in