Hierarchy

⤷

⤷

IMG Activity
ID | CM_XX_1020 | Set Up Status Network |
Transaction Code | S_KK4_82000415 | (empty) |
Created on | 20000807 | |
Customizing Attributes | CM_XX_2_2 | Campus Management Optional Activity (Not Critical) |
Customizing Activity | CM_XX_1020 | Set Up Status Network |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | CM_XX_1020 |
In this activity, you define the progression status transfers. You can map academic progress in the system by combining the progression statuses you defined in the previous activity in accordance with your specific requirements.
You define which status transfers are possible by specifying the sequence of the progression statuses. You can define whether a status transfer is positive (progression prequisite fulfilled) or negative (progression prerequisite not fulfilled). You can specify which default status transfer applies in cases where more than one subsequent status is possible. You can also define how often a particular status transfer may be assigned within a progression status network.
An initial status can have several subsequent statuses. You must create a new entry for each possible status transfer.
Example
Requirements
You have completed the activity Set Up Progression Statuses.
Standard settings
The progression status network in the SAP standard system contains the following entries:
Entry 1:
Initial status: 0
Status transfer: positive
Subsequent status: permitted to continue
Default:
Max. number: 0
Entry 2:
Initial status: 0
Status transfer: positive
Subsequent status: permitted to continue
Default:
Max. number: 0
Entry 3:
Initial status: 0
Status transfer: positive
Subsequent status: Permitted to continue
Default:
Max. number: 0
Entry 4:
Initial status: permitted to continue
Status transfer: positive
Subsequent status: permitted to continue
Default: V
Max. number: 9
Entry 5:
Initial status: permitted to continue
Status transfer: negative
Subsequent status: permitted to continue on condition
Default:
Max. number: 0
Entry 6:
Initial status: permitted to continue
Status transfer: positive
Subsequent status: permitted to graduate
Default:
Max. number: 0
Entry 7:
Initial status: permitted to continue on condition
Status transfer: positive
Subsequent status: permitted to continue
Default:
Max. number: 0
Entry 8:
Initial status: permitted to continue on condition
Status transfer: negative
Subsequent status: permitted to continue on condition
Default: V
Max. number: 3
Entry 9:
Initial status: permitted to continue on condition
Status transfer: negative
Subsequent status: not permitted to continue
Default:
Max. number: 0
Recommendation
Activities
- Choose New entries.
- In the field Initial progression status, enter the initial progression status.
- In the field Prog.status transfer, define whether the status transfer is positive or negative.
- In the field Subs.progress.status, enter the subsequent progression status.
- Set the Default flag to define a progression status transfer as the default. The system uses the default value if more than one subsequent status is possible.
- In the field Maximum number, enter the maximum number of times a status transfer can be assigned.
- When you have made all the required entries, choose Save.
Further notes
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
T7PIQPROGSTATNET | S - Table (with text table) | SM30 |
History
Last changed by/on | SAP | 20000807 |
SAP Release Created in | 462 |