SAP ABAP IMG Activity /MRSS/V_PLANSTAT (Control Display of Planning Status Icon)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
IMG Activity
ID /MRSS/V_PLANSTAT Control Display of Planning Status Icon  
Transaction Code /MRSS/92000393   IMG Activity 
Created on 20130603    
Customizing Attributes /MRSS/V_PLANSTAT   Control Display of Planning Status Icon 
Customizing Activity /MRSS/V_PLANSTAT   Control Display of Planning Status Icon 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name /MRSS/V_PLANSTAT    

Use

In this Customizing activity, you can define for each demand type according to which logic the planning status icon in the worklist is to be displayed. You specify how, that is, based on the comparison of what assignment and demand data the system shall determine the planning status for a demand.

Requirements

Standard settings

SAP does not deliver any standard settings.

Note:
If you do not make any settings in this Customizing activity, the system falls back on the following logic to determine the planning status for a demand:

  • PS demands: The system considers the threshold you define under Sources of Demand -> Define Threshold for "Partially Planned" Status (ERP)".
  • cPro demands: The system considers the threshold you define under Sources of Demand -> Collaboration Projects -> Define Threshold for "Partially Planned" Status. The system considers only hard-booked assignments (status RES_ALLCTD).
  • CRM demands: The system compares the number of assignments and the number of required resources.
  • PM/CS orders: The system compares the number of assignments and the number of required resources, as well as the assignment duration and the total work of the demand.
  • PM/CS notifications: The system compares the number of required resources and the number of assignments.

Activities

Make entries as follows:

  1. Specify the order type and the demand item category (if required).
  2. Specify what data the system is to compare in order to determine the planning status for the demand.
  3. Specify whether the system is to consider only the duration or the total work (= duration multiplied by the number of resources).

    Note that this field is only relevant if you have chosen either DURA or COUNT in the previous step.

  4. For demands originating in cPro or PS, you can make further Customizing settings in the following activities:
    • For cPro demands, you can define a threshold for the Partially Planned status under Sources of Demand -> Collaboration Projects -> Define Threshold for "Partially Planned" Status.
    • For PS demands, you can define a threshold for the Partially Planned status under Sources of Demand -> Define Threshold for "Partially Planned" Status (ERP)".
    • Note that these Customizing activities are only relevant if you have chosen a duration-based comparison option (DURA or BOTH).
      Example: If you have defined a percentage threshold of 80%, the planning status icon changes to Planned if the total assignment duration equals or is higher than the demand duration multiplied by 80%.

      For more information, see the F1 help for the individual fields.

Depending on the demand type, you can override the settings made in this Customizing activity by implementing the following Business Add-Ins(BAdIs):

  • CRM demands: /MRSS/CSG_BADI_ENH_CHECK_DURA
  • cPro demands: /MRSS/DPR_BADI_ENH_CALCULATION
  • PM/CS demands (orders and notifications): /MRSS/NW_BADI_ENH_CHECK_DURA

Example

Business Attributes
ASAP Roadmap ID 201   Make global settings 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG /MRSS/V_PLANSTAT 0 /MRSS/WFF0000002 SAP Multiresource Scheduling 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
/MRSS/V_PLANSTAT V - View SM30  
History
Last changed by/on SAP  20130909 
SAP Release Created in