SAP ABAP IMG Activity /MRSS/C_POT_INTV (Create Time Intervals)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
CA-MRS (Application Component) SAP Multiresource Scheduling
⤷
/MRSS/POT_ENGINE (Package) Capacity Pots Engine

⤷

⤷

IMG Activity
ID | /MRSS/C_POT_INTV | Create Time Intervals |
Transaction Code | /MRSS/92000302 | (empty) |
Created on | 20110505 | |
Customizing Attributes | /MRSS/C_POT_INTV | Create Time Intervals |
Customizing Activity | /MRSS/C_POT_INTV | Create Time Intervals |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | /MRSS/C_POT_INTV |
Use
In this Customizing activity you can create time intervals for which the capacity pots provide capacity. For example, you can create a day interval from 8:00 until 16:00.
You then allocate the time intervals you created to a capacity pot in transaction /MRSS/POT_MNT.
You can structure time intervals as a hierarchy by assigning multiple lower-level time intervals to a higher-level time interval.
Requirements
Standard settings
Activities
Create entries according to your requirements. Proceed as follows:
- Enter an ID for the time interval.
- Assign the time interval to a higher-level time interval if necessary.
- Enter the start time and end time of the time interval.
The following applies:
- If two entries are assigned to the same higher-level time interval, the individual intervals must not overlap.
- If a higher-level time interval is assigned multiple lower-level time intervals, each of the lower-level time intervals must lie within the higher-level time interval.
Example
- You create time interval 2 with the higher-level time interval 1 and define a duration from 8:00 until 8:59. You create time interval 3 with the same higher-level time interval 1. The earliest possible start time for time interval 3 is 9:00.
- The higher-level time interval 1 starts at 8:00 and ends at 20:00. All lower-level time intervals must lie within this time span, for example, time interval 2 from 8:00 until 8:59 and time interval 3 from 9:00 until 9:59. You cannot create any lower-level time intervals that start or end outside the higher-level interval. This means that a lower-level time interval from 6:30 until 8:00 is not possible for time interval 1.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | /MRSS/C_POT_INTV | 0 | /MRSS/WFF0000002 | SAP Multiresource Scheduling |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
/MRSS/V_POT_INTV | V - View | SM30 |
History
Last changed by/on | SAP | 20130123 |
SAP Release Created in | 800 |