SAP ABAP IMG Activity /MRSS/C_POT_INTV (Create Time Intervals)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   CA-MRS (Application Component) SAP Multiresource Scheduling
     /MRSS/POT_ENGINE (Package) Capacity Pots Engine
IMG Activity
ID /MRSS/C_POT_INTV Create Time Intervals  
Transaction Code /MRSS/92000302   (empty) 
Created on 20110505    
Customizing Attributes /MRSS/C_POT_INTV   Create Time Intervals 
Customizing Activity /MRSS/C_POT_INTV   Create Time Intervals 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name /MRSS/C_POT_INTV    

Use

In this Customizing activity you can create time intervals for which the capacity pots provide capacity. For example, you can create a day interval from 8:00 until 16:00.

You then allocate the time intervals you created to a capacity pot in transaction /MRSS/POT_MNT.

You can structure time intervals as a hierarchy by assigning multiple lower-level time intervals to a higher-level time interval.

Requirements

Standard settings

Activities

Create entries according to your requirements. Proceed as follows:

  • Enter an ID for the time interval.
  • Assign the time interval to a higher-level time interval if necessary.
  • Enter the start time and end time of the time interval.

    The following applies:

    • If two entries are assigned to the same higher-level time interval, the individual intervals must not overlap.
    • If a higher-level time interval is assigned multiple lower-level time intervals, each of the lower-level time intervals must lie within the higher-level time interval.

Example

  • You create time interval 2 with the higher-level time interval 1 and define a duration from 8:00 until 8:59. You create time interval 3 with the same higher-level time interval 1. The earliest possible start time for time interval 3 is 9:00.
  • The higher-level time interval 1 starts at 8:00 and ends at 20:00. All lower-level time intervals must lie within this time span, for example, time interval 2 from 8:00 until 8:59 and time interval 3 from 9:00 until 9:59. You cannot create any lower-level time intervals that start or end outside the higher-level interval. This means that a lower-level time interval from 6:30 until 8:00 is not possible for time interval 1.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG /MRSS/C_POT_INTV 0 /MRSS/WFF0000002 SAP Multiresource Scheduling 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
/MRSS/V_POT_INTV V - View SM30  
History
Last changed by/on SAP  20130123 
SAP Release Created in 800