SAP ABAP Class IF_FIP_BADI_SET_PLDT (Interface for BAdI: FIP_BADI_SET_PLDT)
Meta Relationship - Using
| # | Relationship type | Using | Short Description | Created on |
|---|---|---|---|---|
| 1 | Interface composition (i COMPRISING i_ref) | IF_BADI_INTERFACE | Tag Interface for BAdIs | 20080430 |
Properties
| Class | IF_FIP_BADI_SET_PLDT | |
| Short Description | Interface for BAdI: FIP_BADI_SET_PLDT | |
| Super Class | ||
| Instantiability of a Class | 2 | Public |
| Final |
General Data
| Message Class | ||
| Program status | ||
| Category | 0 | |
| Package | ||
| Created | 20080430 | SAP |
| Last change | 20100310 | SAP |
| Shared Memory-enabled | ||
| Fixed point arithmetic | ||
| Unicode checks active |
Forward declarations
Class IF_FIP_BADI_SET_PLDT has no forward declaration.
Interfaces
Class IF_FIP_BADI_SET_PLDT has no interface implemented.
Friends
Class IF_FIP_BADI_SET_PLDT has no friend class.
Attributes
Class IF_FIP_BADI_SET_PLDT has no attribute.
Methods
| # | Method | Level | Visibility | Method type | Description | Created on |
|---|---|---|---|---|---|---|
| 1 | Instance method | Public | Method | set the planned delivery time for lifnr/material/sp | 20080430 | |
| 2 | Instance method | Public | Method | set the planned delivery time for sp/material/rcpt | 20080430 | |
| 3 | Instance method | Public | Method | set the planned delivery time for all recipients of a SP | 20080508 |
Events
Class IF_FIP_BADI_SET_PLDT has no event.
Types
Class IF_FIP_BADI_SET_PLDT has no local type.
Method Signatures
Method SET_PLDT_LIFNR_MAT_SP Signature
| # | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CV_PLDT | Call by reference | Type reference (TYPE) | PLIFZ | Planned delivery time in days | 20080508 | |||
| 2 | IV_LIFNR | Call by reference | Type reference (TYPE) | LIFNR | Account Number of Vendor or Creditor | 20080430 | |||
| 3 | IV_MAT | Call by reference | Type reference (TYPE) | MATNR | Material Number | 20080430 | |||
| 4 | IV_SP | Call by reference | Type reference (TYPE) | WERKS_D | Plant | 20080430 |
Method SET_PLDT_LIFNR_MAT_SP on class IF_FIP_BADI_SET_PLDT has no exception.
Method SET_PLDT_SP_MAT_RCPT Signature
| # | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CV_PLDT | Call by reference | Type reference (TYPE) | PLIFZ | Planned delivery time in days | 20080508 | |||
| 2 | IV_MAT | Call by reference | Type reference (TYPE) | MATNR | Material Number | 20080430 | |||
| 3 | IV_RCPT | Call by reference | Type reference (TYPE) | FIP_RECIPIENT_NUM | FIP Recipient Number | 20080430 | |||
| 4 | IV_SP | Call by reference | Type reference (TYPE) | WERKS_D | Plant | 20080430 |
Method SET_PLDT_SP_MAT_RCPT on class IF_FIP_BADI_SET_PLDT has no exception.
Method SET_PLDT_SP_RCPT Signature
| # | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CO_LOGGER | Call by reference | Object reference (TYPE REF TO) | CL_FIP_MESSAGE_LOGGER | Class for FIP message logging/handling | 20080508 | |||
| 2 | CT_PDT_TO_CUS | Call by reference | Type reference (TYPE) | FIP_T_PDT_TO_CUS | Internal planned delivery time from DC to customer | 20080513 | |||
| 3 | CT_PDT_TO_DC | Call by reference | Type reference (TYPE) | FIP_T_PDT_TO_DC | External planned delivery time from vendor to DC | 20080513 | |||
| 4 | CT_PDT_TO_ST | Call by reference | Type reference (TYPE) | FIP_T_PDT_TO_ST | Internal planned delivery time from DC to store | 20080513 |
Method SET_PLDT_SP_RCPT on class IF_FIP_BADI_SET_PLDT has no exception.
History
| Last changed by/on | SAP | 20100310 |
| SAP Release Created in |