SAP ABAP Table AFVV (DB structure of the quantities/dates/values in the operation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Table Category | TRANSP | Transparent table |
Transparent table | AFVV | Table Relationship Diagram |
Short Description | DB structure of the quantities/dates/values in the operation |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | A | Application Table (Master- and Transaction Data) |
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | MANDT | MANDT | MANDT | CLNT | 3 | 0 | Client | T000 | |
2 | AUFPL | CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
3 | APLZL | CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | AFVC | |
4 | .INCLUDE | 0 | 0 | Include structure of the operation quantities/dates/values | |||||
5 | MEINH | VORME | MEINS | UNIT | 3 | 0 | Unit of measure for activity | T006 | |
6 | UMREN | CP_UMREN | UMBSN | DEC | 5 | 0 | Denominator for converting rtg and op units of measure | ||
7 | UMREZ | CP_UMREZ | UMBSZ | DEC | 5 | 0 | Numerator for converting task list and oper. un. of measure | ||
8 | BMSCH | BMSCH | BMSCH | QUAN | 13 | 3 | Base Quantity | ||
9 | ZMERH | DZMERH | VGWRT | QUAN | 9 | 3 | Break | ||
10 | ZEIER | DZEIER | MEINS | UNIT | 3 | 0 | Unit for the break time | T006 | |
11 | VGE01 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
12 | VGW01 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
13 | VGE02 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
14 | VGW02 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
15 | VGE03 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
16 | VGW03 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
17 | VGE04 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
18 | VGW04 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
19 | VGE05 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
20 | VGW05 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
21 | VGE06 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
22 | VGW06 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
23 | ZEIMU | DZEIMU | MEINS | UNIT | 3 | 0 | Unit for the minimum overlap time | T006 | |
24 | ZMINU | DZMINU | VGWRT | QUAN | 9 | 3 | Minimum overlap time | ||
25 | MINWE | MINWEI | MINWEI | QUAN | 13 | 3 | Minimum Send-Ahead Quantity | ||
26 | ZEIMB | DZEIMB | MEINS | UNIT | 3 | 0 | Unit for the minimum processing time | T006 | |
27 | ZMINB | DZMINB | VGWRT | QUAN | 9 | 3 | Minimum processing time | ||
28 | ZEILM | DZEILM | MEINS | UNIT | 3 | 0 | Unit for the maximum wait time | T006 | |
29 | ZLMAX | DZLMAX | VGWRT | QUAN | 9 | 3 | Maximum wait time | ||
30 | ZEILP | DZEILP | MEINS | UNIT | 3 | 0 | Unit for the required wait time | T006 | |
31 | ZLPRO | DZLPRO | VGWRT | QUAN | 9 | 3 | Minimum wait time | ||
32 | ZEIWN | DZEIWN | MEINS | UNIT | 3 | 0 | Unit for the standard queue time | T006 | |
33 | ZWNOR | DZWNOR | VGWRT | QUAN | 9 | 3 | Standard queue time | ||
34 | ZEIWM | DZEIWM | MEINS | UNIT | 3 | 0 | Unit for the minumum queue time | T006 | |
35 | ZWMIN | DZWMIN | VGWRT | QUAN | 9 | 3 | Minimum queue time | ||
36 | ZEITN | DZEITN | MEINS | UNIT | 3 | 0 | Unit for the standard move time | T006 | |
37 | ZTNOR | DZTNOR | VGWRT | QUAN | 9 | 3 | Standard move time | ||
38 | ZEITM | DZEITM | MEINS | UNIT | 3 | 0 | Unit for the minimum move time | T006 | |
39 | ZTMIN | DZTMIN | VGWRT | QUAN | 9 | 3 | Minimum move time | ||
40 | PLIFZ | PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
41 | DAUNO | DAUNOR | DAUER_4_1 | QUAN | 5 | 1 | Normal duration of the activity | ||
42 | DAUNE | DAUNORE | MEINS | UNIT | 3 | 0 | Normal duration/unit | T006 | |
43 | DAUMI | DAUMIN | DAUER_4_1 | QUAN | 5 | 1 | Minimum activity duration | ||
44 | DAUME | DAUMINE | MEINS | UNIT | 3 | 0 | Unit for the minimum duration | T006 | |
45 | EINSA | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
46 | EINSE | EINSCHRE | RESTRIKEND | CHAR | 1 | 0 | Constraint on the finish date of the activity | ||
47 | ARBEI | ARBEIT | ARBEIT | QUAN | 7 | 1 | Work involved in the activity | ||
48 | ARBEH | ARBEITE | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
49 | MGVRG | MGVRG | MENG13 | QUAN | 13 | 3 | Operation Quantity | ||
50 | ASVRG | ASVRG | MENG13 | QUAN | 13 | 3 | Operation scrap | ||
51 | LMNGA | LMNGA | MENG13 | QUAN | 13 | 3 | Total Yield Confirmed | ||
52 | XMNGA | XMNGA | MENG13 | QUAN | 13 | 3 | Total scrap quantity confirmed | ||
53 | GMNGA | GMNGA | MENG13 | QUAN | 13 | 3 | Confirmed yield in order unit of measure | ||
54 | ISM01 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
55 | ISM02 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
56 | ISM03 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
57 | ISM04 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
58 | ISM05 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
59 | ISM06 | CO_RUMNG | MENG13 | QUAN | 13 | 3 | Previously confirmed activity | ||
60 | ISMNW | CO_ISMNW | MENG13 | QUAN | 13 | 3 | Actual work | ||
61 | FSAVD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
62 | FSAVZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
63 | FSSBD | FSSBD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Processing (date) | ||
64 | FSSBZ | FSSBZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Processing (time) | ||
65 | FSSAD | FSSAD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Teardown (date) | ||
66 | FSSAZ | FSSAZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Teardown (time) | ||
67 | FSEDD | FSEDD | DATUM | DATS | 8 | 0 | Earliest scheduled finish: Execution (date) | ||
68 | FSEDZ | FSEDZ | ATIME | TIMS | 6 | 0 | Earliest scheduled finish: Execution (time) | ||
69 | FSSLD | FSSLD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Wait (date) | ||
70 | FSSLZ | FSSLZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Wait (time) | ||
71 | FSELD | FSELD | DATUM | DATS | 8 | 0 | Earliest scheduled finish: Wait (date) | ||
72 | FSELZ | FSELZ | ATIME | TIMS | 6 | 0 | Earliest scheduled finish: Wait (time) | ||
73 | SSAVD | SSAVD | DATUM | DATS | 8 | 0 | Latest scheduled start: Execution (date) | ||
74 | SSAVZ | SSAVZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Execution (time) | ||
75 | SSSBD | SSSBD | DATUM | DATS | 8 | 0 | Latest scheduled start: Processing (date) | ||
76 | SSSBZ | SSSBZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Processing (time) | ||
77 | SSSAD | SSSAD | DATUM | DATS | 8 | 0 | Latest scheduled start: Teardown (date) | ||
78 | SSSAZ | SSSAZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Teardown (time) | ||
79 | SSEDD | SSEDD | DATUM | DATS | 8 | 0 | Latest scheduled finish: Execution (date) | ||
80 | SSEDZ | SSEDZ | ATIME | TIMS | 6 | 0 | Latest scheduled finish: Execution (time) | ||
81 | SSSLD | SSSLD | DATUM | DATS | 8 | 0 | Latest scheduled start: Wait time (date) | ||
82 | SSSLZ | SSSLZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Wait time | ||
83 | SSELD | SSELD | DATUM | DATS | 8 | 0 | Latest scheduled finish: Wait time (date) | ||
84 | SSELZ | SSELZ | ATIME | TIMS | 6 | 0 | Latest scheduled finish: Wait time | ||
85 | ISAVD | ISAVD | DATUM | DATS | 8 | 0 | Actual operation start (date) | ||
86 | IEAVD | IEAVD | DATUM | DATS | 8 | 0 | Actual finish of operation (date) | ||
87 | ISDD | ISDD | DATUM | DATS | 8 | 0 | Actual start: Execution (date) | ||
88 | ISDZ | ISDZ | ATIME | TIMS | 6 | 0 | Actual start: Execution/setup (time) | ||
89 | IERD | IERD | DATUM | DATS | 8 | 0 | Actual finish: Setup (date) | ||
90 | IERZ | IERZ | ATIME | TIMS | 6 | 0 | Actual finish: Setup (time) | ||
91 | ISBD | ISBD | DATUM | DATS | 8 | 0 | Actual start: Processing (date) | ||
92 | ISBZ | ISBZ | ATIME | TIMS | 6 | 0 | Actual start: Processing (time) | ||
93 | IEBD | IEBD | DATUM | DATS | 8 | 0 | Actual finish: Processing (date) | ||
94 | IEBZ | IEBZ | ATIME | TIMS | 6 | 0 | Actual processing finish (time) | ||
95 | ISAD | ISAD | DATUM | DATS | 8 | 0 | Actual start: Teardown (date) | ||
96 | ISAZ | ISAZ | ATIME | TIMS | 6 | 0 | Actual start: Teardown (time) | ||
97 | IEDD | IEDD | DATUM | DATS | 8 | 0 | Actual finish: Execution (date) | ||
98 | IEDZ | IEDZ | ATIME | TIMS | 6 | 0 | Actual finish: Execution (time) | ||
99 | PEDD | CO_PEDD | DATUM | DATS | 8 | 0 | Forecast finish date of operation from confirmation | ||
100 | PEDZ | CO_PEDZ | ATIME | TIMS | 6 | 0 | Forecast finish time of operation from confirmation | ||
101 | PUFFR | PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
102 | PUFGS | PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
103 | NTANF | VORGABESTD | VORGABESTR | DATS | 8 | 0 | Constraint for activity start (Basic) | ||
104 | NTANZ | VORGABESTZ | ATIME | TIMS | 6 | 0 | Constraint for activity start time (Basic) | ||
105 | NTEND | VORGABEEND | VORGABEEND | DATS | 8 | 0 | Constraint for finish of activity (Basic) | ||
106 | NTENZ | VORGABEENZ | ATIME | TIMS | 6 | 0 | Basic finish time of the activity | ||
107 | EWSTD | EWSTARTD | DATUM | DATS | 8 | 0 | Forecasted start date for the activity | ||
108 | EWSTZ | EWSTARTZ | ATIME | TIMS | 6 | 0 | Forecast start time of the activity | ||
109 | EWEND | EWENDED | DATUM | DATS | 8 | 0 | Forecast finish date | ||
110 | EWENZ | EWENDEZ | ATIME | TIMS | 6 | 0 | Forecast finish time for the activity | ||
111 | EWDAN | EWDAN | DAUER_4_1 | QUAN | 5 | 1 | Normal duration (from forecast) of activity | ||
112 | EWDNE | EWDNE | MEINS | UNIT | 3 | 0 | Unit for forecast normal duration | T006 | |
113 | EWDAM | EWDAM | DAUER_4_1 | QUAN | 5 | 1 | Minimum duration (from forecast) for activity | ||
114 | EWDME | EWDME | MEINS | UNIT | 3 | 0 | Unit for forecast minimum duration | T006 | |
115 | EWSTE | PS_RESTE | RESTRIKEND | CHAR | 1 | 0 | Forecast date constraint on activity finish | ||
116 | EWSTA | PS_RESTA | RESTRIKSTR | CHAR | 1 | 0 | Forecast date constraint on activity start | ||
117 | WARTZ | WARTEZEIT | CX_ZEIT | FLTP | 16 | 16 | Queue time used for scheduling | ||
118 | WRTZE | WTRZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for queue time | ||
119 | RUEST | RUEST | CX_ZEIT | FLTP | 16 | 16 | Setup time | ||
120 | RSTZE | RSTZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for setup time | ||
121 | BEARZ | BEARZEIT | CX_ZEIT | FLTP | 16 | 16 | Processing time | ||
122 | BEAZE | BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
123 | ABRUE | ABRUE | CX_ZEIT | FLTP | 16 | 16 | Teardown | ||
124 | ARUZE | ARUZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for teardown | ||
125 | LIEGZ | LIEGEZEIT | CX_ZEIT | FLTP | 16 | 16 | Wait time used for scheduling | ||
126 | LIGZE | LIGZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for wait time | ||
127 | TRANZ | TRANSZEIT | CX_ZEIT | FLTP | 16 | 16 | Move time used for scheduling | ||
128 | TRAZE | TRAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for move time | ||
129 | ISERH | ISERH | VGWRT | QUAN | 9 | 3 | Confirmed break time | ||
130 | OFM01 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
131 | OFM02 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
132 | OFM03 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
133 | OFM04 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
134 | OFM05 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
135 | OFM06 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
136 | OFMNW | OFMNW | ARBEIT | QUAN | 7 | 1 | Forecasted work (actual + remaining) | ||
137 | BZOFFB | CP_OBZOFFB | CP_BZOFF | CHAR | 2 | 0 | Reference date for start of sub-operation | * | |
138 | EHOFFB | CP_OEHOFFB | MEINS | UNIT | 3 | 0 | Unit for offset to start | T006 | |
139 | OFFSTB | CP_OOFFSTB | VNZTV | QUAN | 5 | 0 | Offset to sub-operation start | ||
140 | OFFSTE | CP_OOFFSTE | VNZTV | QUAN | 5 | 0 | Offset to sub-operation finish | ||
141 | BZOFFE | CP_OBZOFFE | CP_BZOFF | CHAR | 2 | 0 | Reference date for finish of sub-operation | * | |
142 | EHOFFE | CP_OEHOFFE | MEINS | UNIT | 3 | 0 | Unit for offset to finish | T006 | |
143 | FPAVD | FPAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start date (forecast) | ||
144 | FPAVZ | FPAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start time (forecast) | ||
145 | FPEDD | FPEDD | DATUM | DATS | 8 | 0 | Earliest scheduled finish date (forecast) | ||
146 | FPEDZ | FPEDZ | ATIME | TIMS | 6 | 0 | Earliest scheduled finish time (forecast) | ||
147 | SPAVD | SPAVD | DATUM | DATS | 8 | 0 | Latest scheduled start date (forecast) | ||
148 | SPAVZ | SPAVZ | ATIME | TIMS | 6 | 0 | Latest scheduled start time (forecast) | ||
149 | SPEDD | SPEDD | DATUM | DATS | 8 | 0 | Latest scheduled finish date (forecast) | ||
150 | SPEDZ | SPEDZ | ATIME | TIMS | 6 | 0 | Latest scheduled finish time (forecast) | ||
151 | BEAZP | BEAZEP | EINHEIT | UNIT | 3 | 0 | Unit of processing time (Forecast) | ||
152 | PUFGP | PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
153 | PUFFP | PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
154 | BEARP | PBEARZEIT | CX_ZEIT | FLTP | 16 | 16 | Processing time (forecast) | ||
155 | EPANF | EPANF | DATUM | DATS | 8 | 0 | Dispatched start date for operation | ||
156 | EPANZ | EPANZ | ATIME | TIMS | 6 | 0 | Dispatched start time for operation | ||
157 | EPEND | EPEND | DATUM | DATS | 8 | 0 | Dispatched finish date | ||
158 | EPENZ | EPENZ | ATIME | TIMS | 6 | 0 | Dispatched finish time | ||
159 | PDAU | PDAU | DAUER_4_1 | QUAN | 5 | 1 | Forecasted duration of activity from confirmation | ||
160 | PDAE | PDAE | MEINS | UNIT | 3 | 0 | Unit of the forecasted duration from the confirmation | T006 | |
161 | KNOTE | KNOTE | KNOTN | CHAR | 10 | 0 | Transportation Connection Points | * | |
162 | VSTZW | VSTZW | VSTZW | CHAR | 4 | 0 | Deadline function | * | |
163 | VSTGA | VSTGA | VSTGA | CHAR | 4 | 0 | Deadline deviation reason | * | |
164 | QRASTZEHT | QRASTZEHT | MEINS | UNIT | 3 | 0 | Time Unit | * | |
165 | QRASTZFAK | QRASTZFAK | QPROBEFAK | DEC | 5 | 2 | Time Factor | ||
166 | QRASTMENG | QRASTMENG | MENG13 | QUAN | 13 | 3 | Quantity Between Two Inspections | ||
167 | QRASTEREH | QRASTEREH | MEINS | UNIT | 3 | 0 | Grid Unit of Measure | * | |
168 | AUFKT | AFAKT | AFAKT | DEC | 3 | 0 | Execution Factor | ||
169 | RMNGA | RMNGA | MENG13 | QUAN | 13 | 3 | Total confirmed rework quantity | ||
170 | ILE01 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
171 | ILE02 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
172 | ILE03 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
173 | ILE04 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
174 | ILE05 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
175 | ILE06 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | * | |
176 | RWFAK | RWFAK | AUSCHUFAK | DEC | 5 | 3 | Rework factor (is not used yet) | ||
177 | IPRZ1 | CO_IPRZS | MENGV13 | QUAN | 13 | 3 | Confirmed quantity/work for business process | ||
178 | IPRE1 | RU_IPRZE | MEINS | UNIT | 3 | 0 | Unit of measurement for conf. quantity for business process | * | |
179 | IPRK1 | RU_IPRZK | XFELD | CHAR | 1 | 0 | No remaining quantity expected for business process | ||
180 | TAKT | LD_TAKT | LD_TAKT | NUMC | 4 | 0 | takt within a line segment | ||
181 | OPRZ1 | OPRZ1 | MENGV13 | QUAN | 13 | 3 | Remaining quantity for business process | ||
182 | OPRE1 | OPRE1 | MEINS | UNIT | 3 | 0 | Unit for remaining quantity of business process | * |
Foreign Keys
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right | |
---|---|---|---|---|---|---|---|
1 | AFVV | APLZL | AFVC | APLZL | KEY | 1 | 1 |
2 | AFVV | ARBEH | T006 | MSEHI | |||
3 | AFVV | DAUME | T006 | MSEHI | |||
4 | AFVV | DAUNE | T006 | MSEHI | |||
5 | AFVV | EHOFFB | T006 | MSEHI | |||
6 | AFVV | EHOFFE | T006 | MSEHI | |||
7 | AFVV | EWDME | T006 | MSEHI | |||
8 | AFVV | EWDNE | T006 | MSEHI | |||
9 | AFVV | MANDT | T000 | MANDT | |||
10 | AFVV | MEINH | T006 | MSEHI | |||
11 | AFVV | PDAE | T006 | MSEHI | |||
12 | AFVV | VGE01 | T006 | MSEHI | |||
13 | AFVV | VGE02 | T006 | MSEHI | |||
14 | AFVV | VGE03 | T006 | MSEHI | |||
15 | AFVV | VGE04 | T006 | MSEHI | |||
16 | AFVV | VGE05 | T006 | MSEHI | |||
17 | AFVV | VGE06 | T006 | MSEHI | |||
18 | AFVV | ZEIER | T006 | MSEHI | |||
19 | AFVV | ZEILM | T006 | MSEHI | |||
20 | AFVV | ZEILP | T006 | MSEHI | |||
21 | AFVV | ZEIMB | T006 | MSEHI | |||
22 | AFVV | ZEIMU | T006 | MSEHI | |||
23 | AFVV | ZEITM | T006 | MSEHI | |||
24 | AFVV | ZEITN | T006 | MSEHI | |||
25 | AFVV | ZEIWM | T006 | MSEHI | |||
26 | AFVV | ZEIWN | T006 | MSEHI |
History
Last changed by/on | SAP | 20010813 |
SAP Release Created in |