SAP ABAP Data Element CP_OOFFSTB (Offset to sub-operation start)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | CP_OOFFSTB |
Short Description | Offset to sub-operation start |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VNZTV | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Offset |
Medium | 15 | Offset |
Long | 20 | Offset to start |
Heading | 13 | Offset |
Documentation
Definition
Offset between the sub-operation start and the corresponding reference date.
Supplementary Documentation - CP_OOFFSTB0001
Use
The offset is used together with the reference date to calculate the start date of the sub-operation.
- If the offset is negative, there is a preliminary lead time. In this case, the sub-operation start is before the reference date. Please enter the minus sign after the value for the offset (for example, 45-).
- If the offset is positive, there is a lead time offset. In this case, the sub-operation start is after the reference date.
Supplementary Documentation - CP_OOFFSTB2380
Definition
Activity element constraint for the activity start.
Dependencies
The constraint for the start cannot be negative, which means, it cannot be before the activity start date.
Supplementary Documentation - CP_OOFFSTB4430
Definition
Offset between the start of resource usage and the start of the superior operation / superior phase.
Procedure
- If the resource date is after the reference date, enter a positive value for the offset.
- If the resource date is before the reference date, enter a negative value for the offset.
Enter the minus sign after the number.
Supplementary Documentation - CP_OOFFSTB5190
Definition
Offset from the start of usage of the secondary resource to the corresponding reference date.