SAP ABAP Table RPM_TS_PP_SCENARIO_PROJ (RPM : Portfolio prioritization Scenario projects)
Hierarchy
CPRXRPM (Software Component) SAP Portfolio and Project Management 6.0
   PPM-PFM (Application Component) Portfolio Management
     RPM_PORTFOLIO (Package) Portfolio objects
Basic Data
Table Category INTTAB    Structure 
Structure RPM_TS_PP_SCENARIO_PROJ   Table Relationship Diagram
Short Description RPM : Portfolio prioritization Scenario projects    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 SCENARIO_ID RPM_TV_EXTID   CHAR 24   0   ID  
2 PRIORITY SYTABIX SYST_LONG INT4 10   0   Row Index of Internal Tables  
3 PROJECT_ID RPM_TV_EXTID   CHAR 24   0   ID  
4 PROJ_DESCRIPTION RPM_TV_PROJ_DESCRIPTION TEXT40 CHAR 40   0   Item Name  
5 PROJ_WEIGHT RPM_CSF_WEIGHT RPM_CSF_WEIGHT DEC 5   2   Critical Success Factor Weight  
6 PROJ_RANK RPM_CSF_WEIGHT RPM_CSF_WEIGHT DEC 5   2   Critical Success Factor Weight  
7 PROJECT_API RPM_TS_PROJECT_API   STRU 0   0    
8 EXTERNAL_ID RPM_TV_PROJECT_ID   CHAR 24   0   Project ID  
9 PROJ_DESCRIPTION RPM_TV_PROJ_DESCRIPTION TEXT40 CHAR 40   0   Item Name  
10 ACTUALSTART CGPL_ACTUALSTART BCOS_TSTMP DEC 15   0   Actual Start Date  
11 ACTUALFINISH CGPL_ACTUALFINISH BCOS_TSTMP DEC 15   0   Actual Finish Date  
12 PLANSTART CGPL_PLANSTART BCOS_TSTMP DEC 15   0   Planned start date  
13 PLANFINISH CGPL_PLANFINISH BCOS_TSTMP DEC 15   0   Planned Finish Date  
14 COMPLETION CGPL_COMPLETION CGPL_COMPLETION NUMC 3   0   Percentage of Completion  
15 MILESTONE CGPL_MILESTONE CHAR1 CHAR 1   0   Milestone indicator  
16 CONSTRAINT_TYPE CGPL_CONSTRAINT CGPL_CONSTRAINT CHAR 1   0   Type of Scheduling Constraint  
17 CONSTRAINT_TIME CGPL_CONSTRAINT_TIME BCOS_TSTMP DEC 15   0   Constraint Date  
18 LATEST_START CGPL_LATEST_START BCOS_TSTMP DEC 15   0   Latest start  
19 LATEST_FINISH CGPL_LATEST_FINISH BCOS_TSTMP DEC 15   0   Latest finish date  
20 PROJECT_DURATION CGPL_DURATION CGPL_DURATION DEC 8   2   Duration of Execution  
21 DURATION_UNIT CGPL_DURATION_UNIT MEINS UNIT 3   0   Time Unit for Execution Duration  
22 CONSTR_TYPE_FIN CGPL_CONSTRAINT CGPL_CONSTRAINT CHAR 1   0   Type of Scheduling Constraint  
23 CONSTR_TIME_FIN CGPL_CONSTRAINT_TIME BCOS_TSTMP DEC 15   0   Constraint Date  
24 .INCLUDE       0   0   Project attributes  
25 .INCLUDE       0   0   Project attributes  
26 CATEGORY RPM_PROJECT_CATEGORY RPM_PROJECT_CATEGORY NUMC 4   0   Category  
27 SUBCATEGORY RPM_PROJ_SUBCATEGORY RPM_SUBCATEGORY NUMC 4   0   Subcategory  
28 PHASE RPM_PROJECT_PHASE RPM_PROJECT_PHASE NUMC 4   0   Stage  
29 PTYPE RPM_PROJECTTYPE RPM_PROJECTTYPE NUMC 4   0   Group  
30 TTYPE RPM_PROJECT_TECHTYPE RPM_PROJECT_TECHTYPE NUMC 4   0   Technology Type  
31 APSTAT RPM_PROJECT_APPST RPM_PROJECT_APPST NUMC 4   0   Project Approval Status  
32 EXSTAT RPM_PROJECT_EXECSTAT RPM_PROJECT_EXECSTAT NUMC 4   0   Project Execution Status  
33 PPRIO RPM_PROJECT_PRIORITY NUMC4 NUMC 4   0   Project Priority  
34 RISKA RPM_PROJECT_RISK_ASSESED NUMC3 NUMC 3   0   Assessed Project Risk  
35 PROBT RPM_PROJECT_PROB_TECH NUMC3 NUMC 3   0   Probability of Technical Success  
36 PROBC RPM_PROJECT_PROB_COMM NUMC3 NUMC 3   0   Probability of Commercial Success  
37 HEADC RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
38 BUDGT RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
39 COSTF RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
40 COSTA RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
41 COSTD RPM_PROJECT_COST_DEVELOPMENT /RPM/CURR_16_2 CURR 16   2   Development Cost  
42 COSTL RPM_PROJECT_COST_LAUNCH /RPM/CURR_16_2 CURR 16   2   Launch Cost  
43 NPV RPM_PROJECT_NPV /RPM/CURR_16_2 CURR 16   2   Net Present Value (manual)  
44 CURRENCY RPM_TV_CURRENCY WAERS CUKY 5   0   Currency key  
45 LOCATION DPR_TV_LOCATION DPR_LOCATION CHAR 4   0   Location  
46 GEOGRAPHY DPR_TV_AREA DPR_AREA CHAR 4   0   Area  
47 ACTUAL_HEADCOUNT RPM_TV_HEADCOUNT   DEC 10   2   Actual Headcount  
48 RPM_CHANGED_ON RPM_TV_TIMESTAMP RPM_BCOS_TSTMP DEC 15   0   Time Stamp  
49 ACTUAL_WORK RPM_TV_ACTUAL_WORK   DEC 10   2   Actual Work  
50 PLANNED_WORK RPM_TV_PLANNED_WORK   DEC 10   2   Planned Work  
51 WORK_UNITS RPM_TV_ALLOCATION_UNIT RPM_ALLOCATION_UNIT CHAR 3   0   Assignment Unit  
52 BASELINE_START RPM_TV_BASELINE_START   DATS 8   0   Baseline Start  
53 BASELINE_FINISH RPM_TV_BASELINE_FINISH   DATS 8   0   Baseline Finish  
54 COSTF_TD RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
55 COSTA_TD RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
56 ANNUAL_BUDGET RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
57 PERIODTYPE RPM_TV_AVLB_PERIOD RPM_AVLB_PERIOD NUMC 2   0   Period Type (Weekly/Monthly/Generic Interval)  
58 UNIT RPM_TV_RESOURCE_AVAIL_UNIT RPM_ALLOCATION_UNIT CHAR 3   0   Project Resource Supply - Unit  
59 VERSION RPM_TV_VERSION_TYPE RPM_VERSION_TYPE CHAR 1   0   Project Version Type  
60 ITEM_TYPE /RPM/TV_ITEM_ID /RPM/TD_ITEM_TYPE CHAR 15   0   Type  
61 PORTFL_ITEM_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
62 ESCALATION RPM_TV_ESCALATION XFELD CHAR 1   0   Escalation Flag  
63 FORECAST_START RPM_TV_FORECAST_START DATS DATS 8   0   Forecasted Start  
64 PLANNED_START RPM_TV_PLAN_START DATS DATS 8   0   Planned Start Date  
65 ACTUAL_START RPM_TV_ACTUAL_START   DATS 8   0   Actual Start Date  
66 FORECAST_FINISH RPM_TV_FORECAST_FINISH DATS DATS 8   0   Forecasted Finish Date  
67 PLANNED_FINISH RPM_TV_PLAN_FINISH DATS DATS 8   0   Planned Finish Date  
68 ACTUAL_FINISH RPM_TV_ACTUAL_FINISH   DATS 8   0   Actual Finish Date  
69 PORTFOLIO_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
70 PARENT_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
71 ECV RPM_TV_ECV /RPM/CURR_16_2 CURR 16   2   Expected Commercial Value (manual)  
72 PRIORITY_GROUP RPM_PRIORITY_GROUP RPM_PRIORITY_GROUP NUMC 2   0   Priority Group  
73 CHANGED_BY UNAME UNAME CHAR 12   0   User Name  
74 VERSION_ITEM CHAR1 CHAR1 CHAR 1   0   Single-Character Flag  
75 ITEM_CLASS /RPM/TV_ITEM_CLASS /RPM/TD_ITEM_CLASS CHAR 1   0   Item Classification  
76 MASTER_ITEM_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
77 STATUS /RPM/TV_STATUS_COMMON /RPM/TD_STATUS_COMMON CHAR 5   0   Status  
78 CAP_PERIODTYPE /RPM/TV_CAP_PERIOD_TYPE /RPM/TD_PERIOD_TYPE NUMC 2   0   Capacity Period Breakdown  
79 ACT_DPCPT_GUID /RPM/TV_GUID   RAW 16   0   Guid for application objects  
80 DISCOUNT_RATE /RPM/TV_DISCOUNT_RATE /RPM/DEC_5_2 DEC 5   2   Discount Rate  
81 INITIATIVE_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
82 FRCST_BGT_TOTAL /RPM/TV_FORECASTED_BUDGT_TOTAL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Budget Total  
83 FRCST_BGTANNUAL /RPM/TV_FORECASTED_BUDGT_ANNL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Budget Annual  
84 FRCST_COSTTOTAL /RPM/TV_FORECASTED_COST_TOTAL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Cost Total  
85 FRCST_COST_YTD /RPM/TV_FORECASTED_COST_YTD /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Cost YTD  
86 TEMPLATE_GUID /RPM/TV_GUID   RAW 16   0   Guid for application objects  
87 IS_GLOBAL /RPM/TV_GLOBAL XFELD CHAR 1   0   Global Template  
88 .INCLUDE       0   0   Item Detail Customer Fields  
89 EA_DUMMY /RPM/TV_EA_DUMMY CHAR1 CHAR 1   0   Dummy Data Element for Enhanced xRPM Attributes  
90 .INCLUDE       0   0    
91 .INCLUDE       0   0   RPM: Proj atts derived from externally modifiable attributes  
92 .INCLUDE       0   0   Project atts derived from externally modifiable attributes  
93 PRIORITY_PRCNT RPM_PRIORITY_LIMIT_HIGH NUMC4 NUMC 4   0   Project Priority: Upper Limit  
94 PRIORITY_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
95 BUDGET_PRCNT RPM_TV_BUDGET_LIMIT_HIGH DECV03 DEC 3   0   Project Budget Status: Upper Limit  
96 BUDGET_GROUP RPM_TV_BUDGET_GROUP RPM_BUDGET_GROUP NUMC 2   0   Budget Status Group  
97 BUDGET_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
98 SCHEDULE_PRCNT RPM_TV_SCHEDULE_LIMIT_HIGH NUMC3 NUMC 3   0   Project Schedule Status: Upper Limit  
99 SCHEDULE_GROUP RPM_TV_SCHEDULE_GROUP RPM_SCHEDULE_GROUP NUMC 2   0   Schedule Status Group  
100 SCHEDULE_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
101 RISK_PRCNT RPM_RISK_LIMIT_HIGH NUMC3 NUMC 3   0   Risk Group - Upper Limit  
102 RISK_GROUP RPM_RISK_GROUP RPM_RISK_GROUP NUMC 2   0   Risk Group Assessed  
103 RISK_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
104 STAFFING_PRCNT RPM_TV_STAFFING_LIMIT_HIGH NUMC3 NUMC 3   0   Project Staffing Status Group High Limit  
105 STAFFING_GROUP RPM_TV_STAFFING_GROUP RPM_STAFFING_GROUP NUMC 2   0   Staffing Status Group  
106 STAFFING_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
107 PHASE_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
108 PHASE_COLOR RPM_TV_STATUS_COLOR RPM_HTML_COLOR CHAR 7   0   Alert Object Color Status  
109 PROPOSED BOOLE_D BOOLE CHAR 1   0   Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')  
110 DERIVED_RISK RPM_TV_RISK_DERIVED NUMC3 NUMC 3   0   Derived Risk  
111 VAR_COST RPM_PROJ_VARIANCE_COST CURR16 CURR 16   2   Total Variance of Project Planned Cost to Actual Cost  
112 VAR_HEADCOUNT RPM_PROJ_VARIANCE_HEADCOUNT   DEC 10   2   Variance of Project Planned and Actual Headcount  
113 VAR_WORK RPM_TV_ACTUAL_WORK   DEC 10   2   Actual Work  
114 VAR_STARTDATE RPM_PROJ_VAR_DAYS   DEC 8   0   Variance Start Date in Days  
115 VAR_FINISHDATE RPM_PROJ_VAR_DAYS   DEC 8   0   Variance Start Date in Days  
116 VAR_COST_TD RPM_PROJ_VARIANCE_COST CURR16 CURR 16   2   Total Variance of Project Planned Cost to Actual Cost  
117 D_PLANSTART BEGDA DATUM DATS 8   0   Start Date  
118 D_PLANFINISH ENDDA DATUM DATS 8   0   End Date  
119 D_ACTUALSTART BEGDA DATUM DATS 8   0   Start Date  
120 D_ACTUALFINISH ENDDA DATUM DATS 8   0   End Date  
121 HEADC_ACTUAL RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
122 MASTER_PROJECT BOOLE_D BOOLE CHAR 1   0   Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')  
123 LOC_GEOGRAPHY RPM_TV_PROJECT_GEOGRAPHY RPM_PROJECT_GEOGRAPHY CHAR 4   0   Project Geography  
124 DEPENDENCY_COUNT RPM_TV_DEPENDENCY_COUNT NUMC3 NUMC 3   0   Number of Project Dependencies.  
125 DEPENDENCY_GROUP RPM_TV_DEPENDENCY_STATUS RPM_DEPENDENCY_STATUS NUMC 4   0   Dependency Status  
126 DEPENDENCY_ICON ICON_D ICON CHAR 4   0   Icon in text fields (substitute display, alias)  
127 DEPEND_ICONNAME ICONNAME ICONNAME CHAR 30   0   Name of an Icon  
128 DEPENDENCY_TEXT RPM_TV_DP_STATGRP_T TEXT30 CHAR 30   0   Dependency:Status Indicator Text  
129 DELETE_OK BOOLE_D BOOLE CHAR 1   0   Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')  
130 BPS_LINKED BOOLE_D BOOLE CHAR 1   0   Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')  
131 FICO_LINKED BOOLE_D BOOLE CHAR 1   0   Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')  
132 .INCLUDE       0   0   Master Project Summary Fields  
133 SUM_HEADC RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
134 SUM_BUDGT RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
135 SUM_COSTF RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
136 SUM_COSTA RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
137 SUM_COSTD RPM_PROJECT_COST_DEVELOPMENT /RPM/CURR_16_2 CURR 16   2   Development Cost  
138 SUM_COSTL RPM_PROJECT_COST_LAUNCH /RPM/CURR_16_2 CURR 16   2   Launch Cost  
139 SUM_NPV RPM_PROJECT_NPV /RPM/CURR_16_2 CURR 16   2   Net Present Value (manual)  
140 SUM_CURRENCY RPM_TV_CURRENCY WAERS CUKY 5   0   Currency key  
141 SUM_A_HEADCOUNT RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
142 SUM_A_WORK RPM_TV_ACTUAL_WORK   DEC 10   2   Actual Work  
143 SUM_P_WORK RPM_TV_PLANNED_WORK   DEC 10   2   Planned Work  
144 SUM_WORK_UNITS RPM_TV_ALLOCATION_UNIT RPM_ALLOCATION_UNIT CHAR 3   0   Assignment Unit  
145 SUM_COSTF_TD RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
146 SUM_COSTA_TD RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
147 SUM_A_BUDGET RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
148 SUM_V_COST RPM_PROJ_VARIANCE_COST CURR16 CURR 16   2   Total Variance of Project Planned Cost to Actual Cost  
149 SUM_V_HEADCOUNT RPM_PROJ_VARIANCE_HEADCOUNT   DEC 10   2   Variance of Project Planned and Actual Headcount  
150 SUM_V_WORK RPM_TV_ACTUAL_WORK   DEC 10   2   Actual Work  
151 SUM_V_COST_TD RPM_PROJ_VARIANCE_COST_TD CURR16 CURR 16   2   YTD Variance of Project Planned Cost to Actual Cost  
152 SUM_ECV RPM_TV_ECV /RPM/CURR_16_2 CURR 16   2   Expected Commercial Value (manual)  
153 AVG_PROBT RPM_PROJECT_PROB_TECH NUMC3 NUMC 3   0   Probability of Technical Success  
154 AVG_PROBC RPM_PROJECT_PROB_COMM NUMC3 NUMC 3   0   Probability of Commercial Success  
155 .INCLUDE       0   0    
156 .INCLUDE       0   0   Node neighbor IDs  
157 PARENT_ID RPM_TV_PARENT_EXTID   CHAR 24   0   Parent ID  
158 LEFT_ID RPM_TV_LEFT_EXTID   CHAR 24   0   Left ID  
159 RIGHT_ID RPM_TV_RIGHT_EXTID   CHAR 24   0   Right ID  
160 ITEM_DER /RPM/TS_ITEM_D_DERIVED_ATT   STRU 0   0    
161 PRIORITY_ICON /RPM/TV_PRIORITY_ICON ICON CHAR 4   0   Priority  
162 RISK_PRCNT RPM_RISK_LIMIT_HIGH NUMC3 NUMC 3   0   Risk Group - Upper Limit  
163 RISK_GROUP RPM_RISK_GROUP RPM_RISK_GROUP NUMC 2   0   Risk Group Assessed  
164 RISK_ICON /RPM/TV_RISK_ICON ICON CHAR 4   0   Risk  
165 PHASE_ICON /RPM/TV_PHASE_ICON ICON CHAR 4   0   Phase  
166 PHASE_COLOR RPM_TV_STATUS_COLOR RPM_HTML_COLOR CHAR 7   0   Alert Object Color Status  
167 DERIVED_RISK RPM_TV_RISK_DERIVED NUMC3 NUMC 3   0   Derived Risk  
168 D_PLANSTART /RPM/TV_DP_PLAN_START DATUM DATS 8   0   Planned Start  
169 D_PLANFINISH /RPM/TV_DP_PLAN_FINISH DATUM DATS 8   0   Planned Finish  
170 D_ACTUALSTART /RPM/TV_DP_ACTUAL_START DATUM DATS 8   0   Actual Start  
171 D_ACTUALFINISH /RPM/TV_DP_ACTUAL_FINISH DATUM DATS 8   0   Actual Finish Date  
172 HEADC_ACTUAL RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
173 BEGDA_DEM /RPM/TV_PP_START_DEM DATUM DATS 8   0   Demand Planning Start  
174 ENDDA_DEM /RPM/TV_PP_END_DEM DATUM DATS 8   0   Demand Planning Period Finish Date  
175 BEGDA_FIN /RPM/TV_PP_START_FIN DATUM DATS 8   0   Financial Planning Period Start  
176 ENDDA_FIN /RPM/TV_PP_END_FIN DATUM DATS 8   0   Financial Plan Period Finish Date  
177 BUCKET_NAME /RPM/TV_BUCKET_NAME TEXT40 CHAR 40   0   Bucket Name  
178 BUCKET_ID /RPM/TV_BUCKET_ID   CHAR 24   0   Bucket ID  
179 PROPOSAL /RPM/TV_PROPOSAL XFELD CHAR 1   0   Proposal  
180 D_CHANGED_ON /RPM/TV_LAST_CHANGED_ON DATUM DATS 8   0   Changed On Date  
181 MASTER_ITEM_NAME /RPM/TV_MASTER_ITEM_NAME TEXT40 CHAR 40   0   Initiative Name  
182 MASTER_ITEM_ID /RPM/TV_MASTER_ITEM_ID   CHAR 24   0   Initiative ID  
183 HAS_CHILDREN /RPM/TV_ITEM_CHILDREN XFELD CHAR 1   0   Has Children  
184 BUDGET_ICON /RPM/TV_BUDGET_ICON ICON CHAR 4   0   Budget  
185 SCHEDULE_ICON /RPM/TV_SCHEDULE_ICON ICON CHAR 4   0   Schedule  
186 STAFFING_ICON /RPM/TV_STAFFING_ICON ICON CHAR 4   0   Staffing  
187 BUDGET_TOTAL /RPM/TV_BUDGET_TOTAL /RPM/CURR_16_2 CURR 16   2   Total Budget  
188 BUDGET_ANNUAL /RPM/TV_BUDGET_ANNUAL /RPM/CURR_16_2 CURR 16   2   Annual Budget  
189 PLANNED_COST /RPM/TV_PLANNED_COST /RPM/CURR_16_2 CURR 16   2   Planned Costs  
190 PLANNED_COST_YTD /RPM/TV_PLANNED_COST_YTD /RPM/CURR_16_2 CURR 16   2   Planned Costs Year to Date  
191 ACTUAL_COST /RPM/TV_ACTUAL_COST /RPM/CURR_16_2 CURR 16   2   Actual Costs  
192 ACTUAL_COST_YTD /RPM/TV_ACTUAL_COST_YTD /RPM/CURR_16_2 CURR 16   2   Actual Cost Year to Day  
193 ACT_DECPT_NAME /RPM/TV_PHASE_T TEXT80 CHAR 80   0   Decision Point Name  
194 ACT_DECPT_STAT_TEXT /RPM/TV_STATUS_TEXT CHAR40 CHAR 40   0   Active Decision Point Status Text  
195 ACT_DECPT_STAT_ICON /RPM/TV_DECPT_STATUS_ICON ICON CHAR 4   0   Active Decision Point Status  
196 DECPT_INFO /RPM/TV_DECPT_INFO CHAR20 CHAR 20   0   Decision Point Info  
197 STATUS_GROUP /RPM/TV_ITEM_STATUS_GROUP /RPM/ITEM_STATUS_GROUP CHAR 4   0   Status Group  
198 FORECASTED_DURATION /RPM/TV_FORCASTED_DURATION   QUAN 4   0   Forecasted Duration  
199 PLANNED_DURATION /RPM/TV_PLANNED_DURATION   QUAN 4   0   Planned Duration  
200 ACTUAL_DURATION /RPM/TV_ACTUAL_DURATION   QUAN 4   0   Actual Duration  
201 ACT_PHASE_GUID DPR_TV_GUID DPR_GUID RAW 16   0   Application Object GUID  
202 WORKEFFORT_TOTAL /RPM/TV_WORK_EFFORT_TOTAL /RPM/DEC_26_2 DEC 26   2   Actual Effort  
203 WORKEFFORT_YTD /RPM/TV_WORK_EFFORT_YTD /RPM/DEC_26_2 DEC 26   2   Actual Work Effort Year-To-Date  
204 PLANNED_EFFORT /RPM/TV_PLAN_EFFORT /RPM/DEC_26_2 DEC 26   2   Planned Effort  
205 PLANNED_EFFORT_YTD /RPM/TV_PLAN_EFFORT_YTD /RPM/DEC_26_2 DEC 26   2   Planned Effort Year-To-Date  
206 ROI /RPM/TV_ROI /RPM/CURR_16_2 CURR 16   2   Return on Investment in % (manual)  
207 IRR /RPM/TV_IRR /RPM/CURR_16_2 CURR 16   2   Internal Rate of Return in % (manual)  
208 RISK_GROUP_D /RPM/RISK_GROUP_D RPM_RISK_GROUP NUMC 2   0   Risk Group Derived  
209 RISK_D_ICON /RPM/TV_RISK_ICON_D ICON CHAR 4   0   Derived Risk  
210 PLANNED_DECISION_DATE /RPM/TV_PLAND_DDATE DATUM DATS 8   0   Planned Decision date  
211 ACTUAL_DECISION_DATE /RPM/TV_ACTUAL_DDATE DATUM DATS 8   0   Actual Decision Date  
212 FORECAST_DEC_DATE /RPM/TV_FORECAST_DDATE DATUM DATS 8   0   Forecasted Decision Date  
213 D_FORECASTED_START RPM_TV_DP_FORECAST_START DATS DATS 8   0   Forecasted Start  
214 D_FORECASTED_FINISH RPM_TV_DP_FORECAST_FINISH DATS DATS 8   0   Forecasted Finish Date  
215 BUDGET_GROUP RPM_TV_BUDGET_GROUP RPM_BUDGET_GROUP NUMC 2   0   Budget Status Group  
216 SCHEDULE_GROUP RPM_TV_SCHEDULE_GROUP RPM_SCHEDULE_GROUP NUMC 2   0   Schedule Status Group  
217 STAFFING_GROUP RPM_TV_STAFFING_GROUP RPM_STAFFING_GROUP NUMC 2   0   Staffing Status Group  
218 PORTFOLIO_NAME /RPM/TV_PORTFOLIO_NAME TEXT40 CHAR 40   0   Portfolio Name  
219 PORTFOLIO_ID /RPM/TV_PORTFOLIO_ID   CHAR 24   0   Portfolio ID  
220 PLANNED_REVENUE /RPM/TV_PLANNED_REVENUE /RPM/CURR_16_2 CURR 16   2   Planned Revenues  
221 PLANNED_REV_YTD /RPM/TV_PLANNED_REVENUE_YTD /RPM/CURR_16_2 CURR 16   2   Planned Revenues Year to Date  
222 ACTUAL_REVENUE /RPM/TV_ACTUAL_REVENUE /RPM/CURR_16_2 CURR 16   2   Actual Revenues  
223 ACTUAL_REV_YTD /RPM/TV_ACTUAL_REVENUE_YTD /RPM/CURR_16_2 CURR 16   2   Actual Revenues Year to Day  
224 .INCLUDE       0   0   Financial KPIs  
225 NPV_PLAN /RPM/TV_NPV_PLAN /RPM/CURR_16_2 CURR 16   2   Net Present Value  
226 IRR_PLAN /RPM/TV_IRR_PLAN /RPM/CURR_16_2 CURR 16   2   Internal Rate of Return in %  
227 ROI_PLAN /RPM/TV_ROI_PLAN /RPM/CURR_16_2 CURR 16   2   Return on Investment in %  
228 PAYBACK_PLAN /RPM/TV_PAYBACK_PLAN /RPM/TD_PBP_PLAN NUMC 6   0   Payback Periods in Months  
229 ECV_PLAN /RPM/TV_ECV_PLAN /RPM/CURR_16_2 CURR 16   2   Expected Commercial Value  
230 .INCLUDE       0   0   Customer fields for KPI derived attributes  
231 EA_DUMMY_KPI CHAR1 CHAR1 CHAR 1   0   Single-Character Flag  
232 .INCLUDE       0   0    
233 RPM_PROJECT_STKHLDR RPM_TT_PROJ_STKHLD_WITH_BUPA   TTYP 0   0    
234 RPM_PROJECT_STKHLDR_DER RPM_TT_PROJ_STKHLD_DERIVED   TTYP 0   0    
235 PROJECT_SHORT_TEXT RPM_TT_SHORT_TEXT   TTYP 0   0    
236 DEPENDENCIES RPM_TT_PROJ_DEPENDENCY   TTYP 0   0    
237 ORIGINAL_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
History
Last changed by/on SAP  20141109 
SAP Release Created in 200