SAP ABAP Table Field RN1ME_CONFIRM_ORATE_CHANGE-ORDER_DESCR (Medication: Description of Order)
Hierarchy
☛
IS-H (Software Component) SAP Healthcare
⤷
IS-HMED (Application Component) Clinical System
⤷
NMED_ME (Package) IS-H*MED: Medication
⤷
⤷
Basic Data
| Table | RN1ME_CONFIRM_ORATE_CHANGE | Screen Structure for FUB ISHMED_ME_EXTEND_ORDER |
| Field | ORDER_DESCR | Medication: Description of Order |
| Position | 2 |
Field Attributes
| Key | ||
| Mandatory | ||
| Data Element | N1ME_ORDER_DESCR | Medication: Description of Order |
| Check Table | ||
| Nesting depth for includes | 0 | |
| Internal ABAP Type | C | Character String |
| Internal Length in Bytes | 65 | |
| Reference table | ||
| Name of Include | ||
| Reference Field (CURR or QTY) | ||
| Check module | ||
| NOT NULL forced | Any NULL or NOT NULL | |
| Data Type in ABAP Dictionary | CHAR | Character String |
| Length (No. of Characters) | 65 | |
| Number of Decimal Places | 0 | |
| Domain name | ||
| Origin of an input help (F4) | No input help exists | |
| DD: Flag if it is a table | No / FALSE | |
| DD: Depth for structured types | 0 | |
| DD: Component Type | E | Data element |
| Type of Object Referenced | No Information | |
| DD: Indicator for a Language Field | Not selected as language field | |
| Position of the field in the table | 0 |
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 473 |