SAP ABAP Table Field E1BPCCITEMTEXTCHANGE-ORDER_KEY
Hierarchy
☛ EA-GLTRADE (Software Component) SAP Enterprise Extension Global Trade
   ⤷ LO-GT-CHB (Application Component) Chargeback
     ⤷ WCB_CC_BAPI (Package) Condition Contract BAPI Interfaces
Basic Data
Table E1BPCCITEMTEXTCHANGE     Condition Contract: Texts for Eligible Partners for Changes
Field ORDER_KEY    
Position 1    
Field Attributes
Key    
Mandatory    
Data Element      
Check Table      
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 32    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 32    
Number of Decimal Places 0    
Domain name      
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type       Built-in type
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20050615 
SAP Release Created in 600