SAP ABAP Table Field DPR_TS_UI_TABLE_DATA-ICON_CRITICAL_PATH
Hierarchy
☛ CPRXRPM (Software Component) SAP Portfolio and Project Management 6.0
   ⤷ PPM-PRO (Application Component) Project Management
     ⤷ DEVELOPMENT_PROJECTS_UI_LOGIC (Package) Project Management UI Data Formatting
Basic Data
Table DPR_TS_UI_TABLE_DATA     Project Management: Project Data in Table View
Field ICON_CRITICAL_PATH    
Position 40    
Field Attributes
Key    
Mandatory    
Data Element      
Check Table      
Nesting depth for includes 1    
Internal ABAP Type g     Character string with variable length (ABAP type STRING)
Internal Length in Bytes 8    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary STRG     Character String of Variable Length
Length (No. of Characters) 0    
Number of Decimal Places 0    
Domain name      
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type       Built-in type
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20141109 
SAP Release Created in 400