SAP ABAP Table Field DPR_MSPREQUEST_RESPONSE-EARNED_VALUE_METHOD
Hierarchy
☛ CPRXRPM (Software Component) SAP Portfolio and Project Management 6.0
   ⤷ PPM-PRO-EXT (Application Component) Connection to External Systems
     ⤷ DEVELOPMENT_PROJECTS_IMP_EXP (Package) Proj. Mgmt. - Tools and Settings for Project Import/Export
Basic Data
Table DPR_MSPREQUEST_RESPONSE     MSP Project
Field EARNED_VALUE_METHOD    
Position 37    
Field Attributes
Key    
Mandatory    
Data Element      
Check Table      
Nesting depth for includes 0    
Internal ABAP Type X     Byte Seq. (heXadecimal), in DDIC metadata also for INT1/2/4
Internal Length in Bytes 4    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary INT4     4-byte integer, integer number with sign
Length (No. of Characters) 10    
Number of Decimal Places 0    
Domain name      
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 1    
DD: Component Type       Built-in type
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20141109 
SAP Release Created in 500_700