SAP ABAP Table /RPM/TS_ITEM_D_ATT (Item Detail Object Attributes)
Hierarchy
CPRXRPM (Software Component) SAP Portfolio and Project Management 6.0
   PPM-PFM (Application Component) Portfolio Management
     /RPM/API (Package) xRPM External Interfaces
Basic Data
Table Category INTTAB    Structure 
Structure /RPM/TS_ITEM_D_ATT   Table Relationship Diagram
Short Description Item Detail Object Attributes    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 .INCLUDE       0   0   Project attributes  
2 CATEGORY RPM_PROJECT_CATEGORY RPM_PROJECT_CATEGORY NUMC 4   0   Category RPM_PROJ_CAT
3 SUBCATEGORY RPM_PROJ_SUBCATEGORY RPM_SUBCATEGORY NUMC 4   0   Subcategory RPM_PROJ_SUBCAT
4 PHASE RPM_PROJECT_PHASE RPM_PROJECT_PHASE NUMC 4   0   Stage RPM_PROJ_PHASE
5 PTYPE RPM_PROJECTTYPE RPM_PROJECTTYPE NUMC 4   0   Group RPM_PROJ_TYPE
6 TTYPE RPM_PROJECT_TECHTYPE RPM_PROJECT_TECHTYPE NUMC 4   0   Technology Type RPM_PROJ_TTYPE
7 APSTAT RPM_PROJECT_APPST RPM_PROJECT_APPST NUMC 4   0   Project Approval Status RPM_PROJ_APST
8 EXSTAT RPM_PROJECT_EXECSTAT RPM_PROJECT_EXECSTAT NUMC 4   0   Project Execution Status RPM_PROJ_EXST
9 PPRIO RPM_PROJECT_PRIORITY NUMC4 NUMC 4   0   Project Priority  
10 RISKA RPM_PROJECT_RISK_ASSESED NUMC3 NUMC 3   0   Assessed Project Risk  
11 PROBT RPM_PROJECT_PROB_TECH NUMC3 NUMC 3   0   Probability of Technical Success  
12 PROBC RPM_PROJECT_PROB_COMM NUMC3 NUMC 3   0   Probability of Commercial Success  
13 HEADC RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
14 BUDGT RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
15 COSTF RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
16 COSTA RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
17 COSTD RPM_PROJECT_COST_DEVELOPMENT /RPM/CURR_16_2 CURR 16   2   Development Cost  
18 COSTL RPM_PROJECT_COST_LAUNCH /RPM/CURR_16_2 CURR 16   2   Launch Cost  
19 NPV RPM_PROJECT_NPV /RPM/CURR_16_2 CURR 16   2   Net Present Value (manual)  
20 CURRENCY RPM_TV_CURRENCY WAERS CUKY 5   0   Currency key TCURC
21 LOCATION DPR_TV_LOCATION DPR_LOCATION CHAR 4   0   Location DPR_LOCATION
22 GEOGRAPHY DPR_TV_AREA DPR_AREA CHAR 4   0   Area DPR_AREA
23 ACTUAL_HEADCOUNT RPM_TV_HEADCOUNT   DEC 10   2   Actual Headcount  
24 RPM_CHANGED_ON RPM_TV_TIMESTAMP RPM_BCOS_TSTMP DEC 15   0   Time Stamp  
25 ACTUAL_WORK RPM_TV_ACTUAL_WORK   DEC 10   2   Actual Work  
26 PLANNED_WORK RPM_TV_PLANNED_WORK   DEC 10   2   Planned Work  
27 WORK_UNITS RPM_TV_ALLOCATION_UNIT RPM_ALLOCATION_UNIT CHAR 3   0   Assignment Unit  
28 BASELINE_START RPM_TV_BASELINE_START   DATS 8   0   Baseline Start  
29 BASELINE_FINISH RPM_TV_BASELINE_FINISH   DATS 8   0   Baseline Finish  
30 COSTF_TD RPM_PROJECT_COST_FORECAST CURR16 CURR 16   2   Planned Cost  
31 COSTA_TD RPM_PROJECT_COST_ACTUAL CURR16 CURR 16   2   Actual Cost  
32 ANNUAL_BUDGET RPM_PROJECT_BUDGET_PLAN CURR16 CURR 16   2   Budget  
33 PERIODTYPE RPM_TV_AVLB_PERIOD RPM_AVLB_PERIOD NUMC 2   0   Period Type (Weekly/Monthly/Generic Interval)  
34 UNIT RPM_TV_RESOURCE_AVAIL_UNIT RPM_ALLOCATION_UNIT CHAR 3   0   Project Resource Supply - Unit  
35 VERSION RPM_TV_VERSION_TYPE RPM_VERSION_TYPE CHAR 1   0   Project Version Type  
36 ITEM_TYPE /RPM/TV_ITEM_ID /RPM/TD_ITEM_TYPE CHAR 15   0   Type *
37 PORTFL_ITEM_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
38 ESCALATION RPM_TV_ESCALATION XFELD CHAR 1   0   Escalation Flag  
39 FORECAST_START RPM_TV_FORECAST_START DATS DATS 8   0   Forecasted Start  
40 PLANNED_START RPM_TV_PLAN_START DATS DATS 8   0   Planned Start Date  
41 ACTUAL_START RPM_TV_ACTUAL_START   DATS 8   0   Actual Start Date  
42 FORECAST_FINISH RPM_TV_FORECAST_FINISH DATS DATS 8   0   Forecasted Finish Date  
43 PLANNED_FINISH RPM_TV_PLAN_FINISH DATS DATS 8   0   Planned Finish Date  
44 ACTUAL_FINISH RPM_TV_ACTUAL_FINISH   DATS 8   0   Actual Finish Date  
45 PORTFOLIO_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
46 PARENT_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
47 ECV RPM_TV_ECV /RPM/CURR_16_2 CURR 16   2   Expected Commercial Value (manual)  
48 PRIORITY_GROUP RPM_PRIORITY_GROUP RPM_PRIORITY_GROUP NUMC 2   0   Priority Group *
49 CHANGED_BY UNAME UNAME CHAR 12   0   User Name  
50 VERSION_ITEM CHAR1 CHAR1 CHAR 1   0   Single-Character Flag  
51 ITEM_CLASS /RPM/TV_ITEM_CLASS /RPM/TD_ITEM_CLASS CHAR 1   0   Item Classification  
52 MASTER_ITEM_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
53 STATUS /RPM/TV_STATUS_COMMON /RPM/TD_STATUS_COMMON CHAR 5   0   Status *
54 CAP_PERIODTYPE /RPM/TV_CAP_PERIOD_TYPE /RPM/TD_PERIOD_TYPE NUMC 2   0   Capacity Period Breakdown *
55 ACT_DPCPT_GUID /RPM/TV_GUID   RAW 16   0   Guid for application objects  
56 DISCOUNT_RATE /RPM/TV_DISCOUNT_RATE /RPM/DEC_5_2 DEC 5   2   Discount Rate  
57 INITIATIVE_GUID RPM_TV_GUID RPM_GUID RAW 16   0   Guid for application objects  
58 FRCST_BGT_TOTAL /RPM/TV_FORECASTED_BUDGT_TOTAL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Budget Total  
59 FRCST_BGTANNUAL /RPM/TV_FORECASTED_BUDGT_ANNL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Budget Annual  
60 FRCST_COSTTOTAL /RPM/TV_FORECASTED_COST_TOTAL /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Cost Total  
61 FRCST_COST_YTD /RPM/TV_FORECASTED_COST_YTD /RPM/CURR_16_2 CURR 16   2   Portfolio Item Forecasted Cost YTD  
62 TEMPLATE_GUID /RPM/TV_GUID   RAW 16   0   Guid for application objects  
63 IS_GLOBAL /RPM/TV_GLOBAL XFELD CHAR 1   0   Global Template  
64 .INCLUDE       0   0   Item/Initiative Attributes; derrived  
65 PRIORITY_ICON /RPM/TV_PRIORITY_ICON ICON CHAR 4   0   Priority *
66 RISK_PRCNT RPM_RISK_LIMIT_HIGH NUMC3 NUMC 3   0   Risk Group - Upper Limit  
67 RISK_GROUP RPM_RISK_GROUP RPM_RISK_GROUP NUMC 2   0   Risk Group Assessed RPM_PROJ_RKGRP
68 RISK_ICON /RPM/TV_RISK_ICON ICON CHAR 4   0   Risk *
69 PHASE_ICON /RPM/TV_PHASE_ICON ICON CHAR 4   0   Phase *
70 PHASE_COLOR RPM_TV_STATUS_COLOR RPM_HTML_COLOR CHAR 7   0   Alert Object Color Status  
71 DERIVED_RISK RPM_TV_RISK_DERIVED NUMC3 NUMC 3   0   Derived Risk  
72 D_PLANSTART /RPM/TV_DP_PLAN_START DATUM DATS 8   0   Planned Start  
73 D_PLANFINISH /RPM/TV_DP_PLAN_FINISH DATUM DATS 8   0   Planned Finish  
74 D_ACTUALSTART /RPM/TV_DP_ACTUAL_START DATUM DATS 8   0   Actual Start  
75 D_ACTUALFINISH /RPM/TV_DP_ACTUAL_FINISH DATUM DATS 8   0   Actual Finish Date  
76 HEADC_ACTUAL RPM_PROJECT_HEADCOUNT /RPM/DEC_10_2 DEC 10   2   Actual Headcount  
77 BEGDA_DEM /RPM/TV_PP_START_DEM DATUM DATS 8   0   Demand Planning Start  
78 ENDDA_DEM /RPM/TV_PP_END_DEM DATUM DATS 8   0   Demand Planning Period Finish Date  
79 BEGDA_FIN /RPM/TV_PP_START_FIN DATUM DATS 8   0   Financial Planning Period Start  
80 ENDDA_FIN /RPM/TV_PP_END_FIN DATUM DATS 8   0   Financial Plan Period Finish Date  
81 BUCKET_NAME /RPM/TV_BUCKET_NAME TEXT40 CHAR 40   0   Bucket Name  
82 BUCKET_ID /RPM/TV_BUCKET_ID   CHAR 24   0   Bucket ID  
83 PROPOSAL /RPM/TV_PROPOSAL XFELD CHAR 1   0   Proposal  
84 D_CHANGED_ON /RPM/TV_LAST_CHANGED_ON DATUM DATS 8   0   Changed On Date  
85 MASTER_ITEM_NAME /RPM/TV_MASTER_ITEM_NAME TEXT40 CHAR 40   0   Initiative Name  
86 MASTER_ITEM_ID /RPM/TV_MASTER_ITEM_ID   CHAR 24   0   Initiative ID  
87 HAS_CHILDREN /RPM/TV_ITEM_CHILDREN XFELD CHAR 1   0   Has Children  
88 BUDGET_ICON /RPM/TV_BUDGET_ICON ICON CHAR 4   0   Budget *
89 SCHEDULE_ICON /RPM/TV_SCHEDULE_ICON ICON CHAR 4   0   Schedule *
90 STAFFING_ICON /RPM/TV_STAFFING_ICON ICON CHAR 4   0   Staffing *
91 BUDGET_TOTAL /RPM/TV_BUDGET_TOTAL /RPM/CURR_16_2 CURR 16   2   Total Budget  
92 BUDGET_ANNUAL /RPM/TV_BUDGET_ANNUAL /RPM/CURR_16_2 CURR 16   2   Annual Budget  
93 PLANNED_COST /RPM/TV_PLANNED_COST /RPM/CURR_16_2 CURR 16   2   Planned Costs  
94 PLANNED_COST_YTD /RPM/TV_PLANNED_COST_YTD /RPM/CURR_16_2 CURR 16   2   Planned Costs Year to Date  
95 ACTUAL_COST /RPM/TV_ACTUAL_COST /RPM/CURR_16_2 CURR 16   2   Actual Costs  
96 ACTUAL_COST_YTD /RPM/TV_ACTUAL_COST_YTD /RPM/CURR_16_2 CURR 16   2   Actual Cost Year to Day  
97 ACT_DECPT_NAME /RPM/TV_PHASE_T TEXT80 CHAR 80   0   Decision Point Name  
98 ACT_DECPT_STAT_TEXT /RPM/TV_STATUS_TEXT CHAR40 CHAR 40   0   Active Decision Point Status Text  
99 ACT_DECPT_STAT_ICON /RPM/TV_DECPT_STATUS_ICON ICON CHAR 4   0   Active Decision Point Status *
100 DECPT_INFO /RPM/TV_DECPT_INFO CHAR20 CHAR 20   0   Decision Point Info  
101 STATUS_GROUP /RPM/TV_ITEM_STATUS_GROUP /RPM/ITEM_STATUS_GROUP CHAR 4   0   Status Group  
102 FORECASTED_DURATION /RPM/TV_FORCASTED_DURATION   QUAN 4   0   Forecasted Duration  
103 PLANNED_DURATION /RPM/TV_PLANNED_DURATION   QUAN 4   0   Planned Duration  
104 ACTUAL_DURATION /RPM/TV_ACTUAL_DURATION   QUAN 4   0   Actual Duration  
105 ACT_PHASE_GUID DPR_TV_GUID DPR_GUID RAW 16   0   Application Object GUID  
106 WORKEFFORT_TOTAL /RPM/TV_WORK_EFFORT_TOTAL /RPM/DEC_26_2 DEC 26   2   Actual Effort  
107 WORKEFFORT_YTD /RPM/TV_WORK_EFFORT_YTD /RPM/DEC_26_2 DEC 26   2   Actual Work Effort Year-To-Date  
108 PLANNED_EFFORT /RPM/TV_PLAN_EFFORT /RPM/DEC_26_2 DEC 26   2   Planned Effort  
109 PLANNED_EFFORT_YTD /RPM/TV_PLAN_EFFORT_YTD /RPM/DEC_26_2 DEC 26   2   Planned Effort Year-To-Date  
110 ROI /RPM/TV_ROI /RPM/CURR_16_2 CURR 16   2   Return on Investment in % (manual)  
111 IRR /RPM/TV_IRR /RPM/CURR_16_2 CURR 16   2   Internal Rate of Return in % (manual)  
112 RISK_GROUP_D /RPM/RISK_GROUP_D RPM_RISK_GROUP NUMC 2   0   Risk Group Derived RPM_PROJ_RKGRP
113 RISK_D_ICON /RPM/TV_RISK_ICON_D ICON CHAR 4   0   Derived Risk *
114 PLANNED_DECISION_DATE /RPM/TV_PLAND_DDATE DATUM DATS 8   0   Planned Decision date  
115 ACTUAL_DECISION_DATE /RPM/TV_ACTUAL_DDATE DATUM DATS 8   0   Actual Decision Date  
116 FORECAST_DEC_DATE /RPM/TV_FORECAST_DDATE DATUM DATS 8   0   Forecasted Decision Date  
117 D_FORECASTED_START RPM_TV_DP_FORECAST_START DATS DATS 8   0   Forecasted Start  
118 D_FORECASTED_FINISH RPM_TV_DP_FORECAST_FINISH DATS DATS 8   0   Forecasted Finish Date  
119 BUDGET_GROUP RPM_TV_BUDGET_GROUP RPM_BUDGET_GROUP NUMC 2   0   Budget Status Group RPM_PROJ_BDGRP
120 SCHEDULE_GROUP RPM_TV_SCHEDULE_GROUP RPM_SCHEDULE_GROUP NUMC 2   0   Schedule Status Group RPM_PROJ_SDGRP
121 STAFFING_GROUP RPM_TV_STAFFING_GROUP RPM_STAFFING_GROUP NUMC 2   0   Staffing Status Group RPM_PROJ_STGRP
122 PORTFOLIO_NAME /RPM/TV_PORTFOLIO_NAME TEXT40 CHAR 40   0   Portfolio Name  
123 PORTFOLIO_ID /RPM/TV_PORTFOLIO_ID   CHAR 24   0   Portfolio ID  
124 PLANNED_REVENUE /RPM/TV_PLANNED_REVENUE /RPM/CURR_16_2 CURR 16   2   Planned Revenues  
125 PLANNED_REV_YTD /RPM/TV_PLANNED_REVENUE_YTD /RPM/CURR_16_2 CURR 16   2   Planned Revenues Year to Date  
126 ACTUAL_REVENUE /RPM/TV_ACTUAL_REVENUE /RPM/CURR_16_2 CURR 16   2   Actual Revenues  
127 ACTUAL_REV_YTD /RPM/TV_ACTUAL_REVENUE_YTD /RPM/CURR_16_2 CURR 16   2   Actual Revenues Year to Day  
128 .INCLUDE       0   0   Financial KPIs  
129 NPV_PLAN /RPM/TV_NPV_PLAN /RPM/CURR_16_2 CURR 16   2   Net Present Value  
130 IRR_PLAN /RPM/TV_IRR_PLAN /RPM/CURR_16_2 CURR 16   2   Internal Rate of Return in %  
131 ROI_PLAN /RPM/TV_ROI_PLAN /RPM/CURR_16_2 CURR 16   2   Return on Investment in %  
132 PAYBACK_PLAN /RPM/TV_PAYBACK_PLAN /RPM/TD_PBP_PLAN NUMC 6   0   Payback Periods in Months  
133 ECV_PLAN /RPM/TV_ECV_PLAN /RPM/CURR_16_2 CURR 16   2   Expected Commercial Value  
134 .INCLUDE       0   0   Customer fields for KPI derived attributes  
135 EA_DUMMY_KPI CHAR1 CHAR1 CHAR 1   0   Single-Character Flag  
136 .INCLUDE       0   0    
137 .INCLUDE       0   0    
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 /RPM/TS_ITEM_D_ATT APSTAT RPM_PROJ_APST APPST REF 1 CN
2 /RPM/TS_ITEM_D_ATT BUDGET_GROUP RPM_PROJ_BDGRP BUDGET_GROUP KEY 1 CN
3 /RPM/TS_ITEM_D_ATT CATEGORY RPM_PROJ_CAT CATEGORY REF 1 CN
4 /RPM/TS_ITEM_D_ATT CURRENCY TCURC WAERS REF 1 CN
5 /RPM/TS_ITEM_D_ATT EXSTAT RPM_PROJ_EXST EXCST REF 1 CN
6 /RPM/TS_ITEM_D_ATT GEOGRAPHY DPR_AREA AREA REF 1 CN
7 /RPM/TS_ITEM_D_ATT LOCATION DPR_LOCATION LOCATION REF 1 CN
8 /RPM/TS_ITEM_D_ATT PHASE RPM_PROJ_PHASE PHASE REF 1 CN
9 /RPM/TS_ITEM_D_ATT PTYPE RPM_PROJ_TYPE PTYPE KEY 1 CN
10 /RPM/TS_ITEM_D_ATT RISK_GROUP RPM_PROJ_RKGRP RISK_GROUP KEY 1 CN
11 /RPM/TS_ITEM_D_ATT RISK_GROUP_D RPM_PROJ_RKGRP RISK_GROUP KEY 1 CN
12 /RPM/TS_ITEM_D_ATT SCHEDULE_GROUP RPM_PROJ_SDGRP SCHED_GROUP KEY 1 CN
13 /RPM/TS_ITEM_D_ATT STAFFING_GROUP RPM_PROJ_STGRP STAFFING_GROUP KEY 1 CN
14 /RPM/TS_ITEM_D_ATT SUBCATEGORY RPM_PROJ_SUBCAT SUBCATEGORY REF 1 CN
15 /RPM/TS_ITEM_D_ATT TTYPE RPM_PROJ_TTYPE TTYPE REF 1 CN
History
Last changed by/on SAP  20141109 
SAP Release Created in 400