SAP ABAP Table /MRSS/D_ASG_PROC (Process Times (Preparation and Wrap up) of an Assignment)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Table Category TRANSP    Transparent table 
Transparent table /MRSS/D_ASG_PROC   Table Relationship Diagram
Short Description Process Times (Preparation and Wrap up) of an Assignment    
Delivery and Maintenance
Pool/cluster      
Delivery Class A   Application Table (Master- and Transaction Data) 
Data Browser/Table View Maintenance X   Display/Maintenance Allowed 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MANDT MANDT MANDT CLNT 3   0   Client *
2 PROCESS_TIME_KEY /MRSS/T_GUID SYSUUID RAW 16   0   GUID  
3 .INCLUDE       0   0   Process Times (Preparation and Wrap up) for Internal Display  
4 PREP_START /MRSS/T_SGE_TIMESTAMP BCOS_TSTMP DEC 15   0   Timestamp (with conv. routine)  
5 PREP_END /MRSS/T_SGE_TIMESTAMP BCOS_TSTMP DEC 15   0   Timestamp (with conv. routine)  
6 PREP_DURATION /MRSS/T_PREPARATION_DURATION INT4 INT4 10   0   Preparation Duration  
7 WRAP_UP_START /MRSS/T_SGE_TIMESTAMP BCOS_TSTMP DEC 15   0   Timestamp (with conv. routine)  
8 WRAP_UP_END /MRSS/T_SGE_TIMESTAMP BCOS_TSTMP DEC 15   0   Timestamp (with conv. routine)  
9 WRAP_UP_DURATION /MRSS/T_WRAP_UP_DURATION INT4 INT4 10   0   Wrap up Duration  
History
Last changed by/on SAP  20141109 
SAP Release Created in 800