Message class | ![]() |
PRP | |
Short Description | ![]() |
Project Resource Planning: General Messages | |
Message Number | ![]() |
088 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
You cannot staff role &2 with resource &1
Help Document
Diagnosis
You want to staff role with user . This would enable the user to have the authorization defined in the role type for all the project elements to which this is assigned, if required.
However there is at least one project element below the project definition (phase, task, or checklist) that cannot be locked because the project element or a lower-level project element is already being processed.
System Response
To prevent inconsistencies between staffing and the authorizations assigned, the system does not allow the role to be staffed.
Procedure
Try to staff the role again later on. This is possible once all the phases, tasks, and checklists involved can be locked.
Procedure for System Administration