Hierarchy

⤷

⤷

Attribute
Message class | ![]() |
5Z | |
Short Description | ![]() |
IS-HR/PSG Public Sector Payroll - Germany | |
Message Number | ![]() |
512 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20000829 |
Message Text
Help Document
Diagnosis
The highest level for this pay scale is predefined as pay scale level in view V_T5D7K (Parameters for BDA Determination (Basic Pay) PSG). In the AdvGr field, you have entered pay scale level(s) for advance granting. The total from the regular level for the employee and the pay scale levels granted in advance exceeds the defined highest level for the pay scale.
System Response
- Infotype Basic Pay (0008): The SAP system enters highest level in the Level field.
- Infotype Wage Maintenance (0052): The SAP system cannot determine the current pay scale level for the employee.
Procedure
Infotype Wage Maintenance (0052): Check the number of pay scale levels granted in advance in the AdvGr field and reduce this number so that the highest level for the pay scale is no longer exceeded.
If a higher level is permitted than the level specified in the Customizing settings, (view V_T5d7K), contact your system administration. Note the Type, Area, and Group of the specified pay scale and provide this information to system administration.
Procedure for System Administration
History
Last changed on/by | ![]() |
20130531 | SAP |
SAP Release Created in |